Loading…
Loading…
9,284 results • Latest
Construction and maintenance work of Bataubir mai naupedawa (ODR) road ke km 6 to left durga patti link road (including 05 years maintenance)
Construction and maintenance work of Ramnagar to ramnipur link road ke km 2 se baye kammarpur thakur basti link road (including 05 years maintenance)
Construction and maintenance work of vikas khand Maharajganj ke gram sabha sawansa me sari vibhar pitch road to maurya basti hote huye shrivastav and brahaman basti tak (including 05 years maintenance)
Construction and maintenance work of gram abbopur me purab ka pura link road (including 05 years maintenance)
C/O Vikash khand ke maharajganj Gramsabha kailawal ke sona mishra ka pura pitch road to sukhau ka pura hote huye jhaliya brahaman basti tak(including 05 years maintenance)
Construction and maintenance work of Vikas khand badalapur ke prayagraj gorakhpur SH-34 road to bhaluwahi me jitendra singh purv sabhasad ke ghar vai Vithuakala link road (including 05 years maintenance)
Construction work of Uttarpatti Kewat basti Link Road (including 5-year maintenance)
Construction and maintenance work of Sarpataha samodhpur road ke km 1 to right kammarpur gram me sthith stadium vai kammarpur link road ke pitch road tak (including 05 years maintenance)
Construction and maintenance work of Vikas khand Maharajganj Gramsabha Hilali me Dandupur Border pitch road in balbir gaud house vai nonari bind basti link road (including 05 years maintenance)
Construction work of Toll plaza to Bachchulal House to Shadipur Brahman basti Link Road (including 5-year maintenance)
Construction work of Jairampur Maurya basti Link Road (including 5-year maintenance)
Construction work of Chakmirdaha Link Road (including 5-year maintenance)
Construction work of Daudi bharawat basti 2nd Link Road (including 5-year maintenance)
Construction work of the Jamuhai pakki main road to scolar school beside to Prajapati and Thakur Basti and Prajapati Basti link road (including 5-year maintenance)
Construction work of Kauwapar Pal basti Link Road (including 5-year maintenance)
C/O Gajaffarpur link road (Including 5 Year Maintance)
Construction work of Sui Khas Link Road (including 5-year maintenance)
Construction work of Ara to Kharialla basti Link Road (including 5-year maintenance)
ADDN / ALTN / IMP TO BLDG NO PF-14 AT AFS BIDAR
PROVN OF SWIMMING POOL AT FAZILKA ON EPC MODE
B. Construction of water courses for ayacut under Panipanchayat No SIP SMC 01 Uchhagan Sm, Nutandihi Sm, Kapadiha Minor, Mundabani Sm, Janakipur Sm, kapadiha Sm of all structures including missing link.
Shifting of 11KV Line for Construction of RD road from Saplahar via Palsani under RWES Bargarh
Provision of DG and panel for RW Circle office Sundargarh for the year 2026-27_building
Provision of External power supply to RW Banspal Division for the year 2026-27_building
Provision of Audio and Video System for Conference Hall at RW Circle office Keonjhar for the year 2026-27_building
Provision of Audio and video conferencing system to Conference hall of RW Division Patnagarh at Rampur for the year 2026-27_building
Shifting of 11KV Line for Construction of road from Sareikela to Badikata under RWES Bargarh
Provision of Audio and video system for conference hall for RW Division at Kamakhyanagar for the year 2026-27_building
A.Construction of water courses for ayacut under Panipanchayat No SIP SMC 02 ,Neda Minor, Banagan Sm , Koldiha Sm of all structures including missing link.
CERTAIN REPAIR TO FITTING/ FIXTURES TO HANGER AND BLAST PEN AND CONNECTED ITEMS AT AF STN AWANTIPUR
ADDN / ALTN AND SPECIAL REPAIRS TO CERTAIN MD ACCN AT SHILLONG UNDER GE SHILLONG
SPECIAL REPAIR TO BLDG NO P 1 PERS COOK HOUSE PORTION OF MH AT FARIDKOT MIL STN
SPECIAL REPAIR TO BLDG NO P 02 OFFR MESS HQ ARTY BDE AT FARIDKOT MIL STN
ANNUAL MAINTENANCE WORKS PROGRAMME FOR OFFICE ACCOMODATION PAO(ORs) CORPS OF SIGNAL JABALPUR FOR FY 2026-27
IMPROVEMENT OF WATER SUPPLY SYSTEM AT 51 I SUP PI ASC UNDER GE MIS MHOW
REPAIR/ MAINT TO E/M INSTALLATION INCLUDING FITTING/ FIXTURES AND CONNECTED ITEMS AT GE (AF) AWANTIPUR
Con of (ISS) near vlg Sikuan in the district of Blgr acr river Sungarh incl Hydro Mech Works Power Conc Works, Road Connc, Stf Qtr incl Svey Invg Plng Design, est of all Compo with OM of the proj for 5yearsor5Flood Sesn whichever is more after succ c
Resectioning D/Sslope of Rt.Dyke,Impvt.to Dam top D/S Dwarf wall,long.and Trs.drain on Dam slope,Restoration to toe drain,Impvt.to Rt Dyke Dam top road,Const.of DG shed including colour washing to Spillway,Parapet,dwarf wall of Derjang Dam underDPIW.
Improvement with structure works to Drainage Channels
Improvement with structure works to Drainage Channels
SPECIAL REPAIR TO BLDG NO S-95 AND CERTAIN REVENUE AND MINOR WORKS AT MASIMPUR MILITARY STATION
Supply of Submersible Pump Set at Central Store Tubewell Division Haridwar (Bahadrabad)
Construction of C.C. Lining work to Daha Left Distributary from RD 650 m to 7500m under Daha Irrigation Project.
Supply of M.S Column Pipe 150 mm dia with Socket Klit and Nut, 100 mm dia with Socket Klit and Nut, Nut and Bolt,Pannel Board and Bakelite Sheet at Central Store Tubewell Division Haridwar (Bahadrabad) Lot 03
Supply of PVC Flat Cable and 3 core 10 mm 2 at Central Store Tubewell Division Haridwar (Bahadrabad) Lot 04
Supply of Unplasticized PVC Pipe 200 mm dia at Central Store Tubewell Division Haridwar (Bahadrabad) Lot 01
Supply of PVC Flat Cable 3 core 6 mm2 and 3 core 10 mm2 at Central Store Tubewell Division Haridwar (Bahadrabad)
Construction Work