Loading…
Loading…
47 results • Recent activity
Development of Indoor Stadium of 2600 Seating Capacity with a Cricket Net Practice Facility at V.O. Chidambaranar Port Authority
Construction of Seafarers Club in custom bond Area at V.O.Chidambaranar Port
Construction of Shed with Concrete Flooring for common Solid Waste recycling facility at VOC Port
Conducting Bathymetry survey by deploying a Hydrographic survey team in the inner harbour basin, approach channel at V.O.Chidambaranar Port
Replacing the damaged RCC Cover Slab over cable trench leading from the Electrical Substation to Traffic Office at Additional Berth inside Green Gate in VOC Port
Widening the GG Entrance Portion at south side by Dismantling the existing RR Masonry Compound wall and Construction of RR Compound wall along North side of MP Shed for smooth movement of Windmill Blades Over Dimension Cargos Two Wheeler LMV in GG