Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
4,495 results • Latest
Demolition of Existing Damaged building GYM Building at Old Vazhama Nagar in Div-73, Unit-17A, Zone-06
PROVDING AND LAYING OF HUME PIPE LINE TO MISSING LINK STORM WATER DRAIN SWD DISPOSAL SECRETARIAT COLONY 8TH STREET AND SECRETARIAT COLONY 21TH STREET TO RETTERI LAKE IN DIVSION -30,UNIT-08,ZONE-03
Repair and Maintenance of ICDS Compound Wall at Thanikachalam Nagar f Block 6th Street in Div-30,Unit-08,Zone-03
Officers room Interior works at First floor Ripon Building in div 58 Zone 05
Additional Works for Canteen Building in Ripon Building Campus (West Side) inDiv-58, Zone-05.
Repair and Maintenance of ICDS Compound Wall at Vinayagapuram PRH Road in Div-30,Unit-08,Zone-03
Repair and Maintenance 16th Ceremony at Burial Ground Road in Div-30,Unit-08,Zone-03
Road Cut Restoration (Bt Road) made by CMWSSB (WSS)at Annai indra Nagar 1st, Street in Dn -196, U-45,Zone-XV
Restoration of BT Road Cut made by CMWSSB (UGSS) in VPG Avenue Extension 1st Street in Dn .-195,U-45,Zone-XV
Restoration of BT Road Cut made by CMWSSB (UGSS) in NEHRU NAGAR MAIN ROAD (Chandrasekar Nagar 1st Main Road ) and VPG Avenue 1st and 2nd Street in Dn .-195,U-45,Zone-XV
El.D.C.No.SM II /P1/2928/ 2026 Removal and Refixing of 4 Kwp Solar Roof Top Panel at Nettukuppam CMS school in dn-1 and 4Kwp Solar Roof Top Panel at Periyakuppam CPS School in dn-2 Unit-1 Zone-I Tiruvottiyur
El.D.C.No.SM II /P1/3138/ 2026 Removal and Refixing of 1no of 4kwp at Annai sivagami ngr CPS school in dn 3 1no of 2kwp 1no of 5kwp Solar Roof Top Panel at Community Hall and UPHC Hospital Ramanathapuram in Dn 4 Unit 1 Zone I Tiruvottiyur
El.D.C.No.SM II/P1/3223/2026 Removal and Refixing of 3 Nos of 5KWP solar Roof Top Panel at Solayappan street CWC Shaik Mastirie street Telugu CHS School OHS road in Royapuram section in dn 49 50 and 52 Zone V
OPERATION AND COMPREHENSIVE MAINTENANCE FOR 9 NOS. OF LMV COMPACTORS OF 6 CU.M CAPACITY FOR A PERIOD OF 150 DAYS
Restoration of Road Cut made by CMWSSB (UGSS) in VPG Avenue 7th Street in Dn .-195,U-45,Zone-XV
El.D.C.No.South/2283/2026 Supply and Laying of 473 Mtrs of 3 1/2 X 120/240 sq mm Alu UG cable at Perungudi dumping ground for windrow compositing process Plant 1 and 2 in Division 184 Zone 14
El.D.C.No.South/0635/2026 Supply and Laying of 1609 Mtrs of 2/4 X 25/16 sq mm Alu UG cable at Kannan nagar Voltas colony main road college road Nanganallur 5 main road and Various Locations at Division 164 166 167 Zone 12
El.D.C.No.South/0904/2026 Supply and Erection of 41 Nos of 7/9.5 Mtr street lamp post with LED fittings at Arcot Road from Alappakkam Junction to Hospital Road Junction in Dn 151 Zone 11 Deposit Work CMRL
El.D.C.No.South/0636/2026 Removal of 7 nos TNEB over head post Conversation of HT LT Over head line to Under ground cable and Errection of 1 no DB structure with AB switch at PH Road near Om Sakthi Nagar for New bridge work Div 144 Zone 11
Hiring of inspection vehicle to Senior Revenue Officer Zone-15 for one year (Maruthi 4 plus 1 (D) Seating Capacity AC Swift Dzire or Equivalant).
El.D.C.No.Centre/0639/2026 Supply and Erection of 34 Nos of 7 Mtr street lamp post with LED fittings at Madley Subway in Dn 133 and 134 Zone 10
El.D.C.No.Centre/0323/2026 Supply and Erection of 25 Nos of 7 Mtr street lamp post with LED fittings at Arcot Road from Kamarajar Salai junction to Eakambaram Street Junction in Dn 129 Zone 10 Deposit Work CMRL
El.D.C.No.Centre/724/2026 Supply and Erection of 32 Nos of 7mtr lamp post at Bajanai koil street Rajaveethi street and Kalyanapuram in Div109 Zone IX
Proposed Construction of storm water drain of size 1200 x 1200 mm at Prakasam Salai (Chainage 0.00 to 120.00m) in Div-56 Unit-13 Zone-5
El.D.C.No.Centre/272/2026/ Supply and Erection of 20 Nos of 7 Mtr lamp post with LED fittings at Anna Park Service Road in Div 114, Zone 9
To Engage Consultancy Service for the Preparation of Detailed Project Report for Construction of School Building at CIT Nagar 4th Main Road Chennai in Div 141 Zone 10
To Engage Consultancy Service for the Detailed Project Report CMS at 127 Angalamman Koil Street Choolai Purasaiwalkam in Div 76 Zone 06
To Engage Consultancy Service for the Detailed Project Report for CMS at Surapet in Div 32 Zone 03
Road Cut Restoration (BT road)made by CMWSSB(WSS)at Kannagi Nagar Link Road in Dn.-196,U-46,Zone-XV
Forming of CC Road at Teachers Colony Extension in Division-194,Unit-44, Zone-15 (Under Councilor Fund 2025-26)
Restoration of BT Road Cut made by CMWSSB (UGSS) in Bharathi Nagar - Sai Baba Nagar 2nd cross street in Dn- 195, Unit -45, Zone - 15.
Restoration of Road Cut made by CMWSSB (UGSS) in Annai Avenue 2nd Street in Dn .-195,U-45,Zone-XV
Roadcut Restoration of BT and CC roads made by CMWSSB (Water) and (Sewer) at Bricklin Road 1st and 5th st, Vengatesan st, Chinna Thambi st, V.V. Koil st, and Vengatammal Samathi st in Div-76, Unit-17, Zone-6.
Construction of shed for Generator at Bunder Garden school in Div 70 Unit 16 Zone 6
Road Cut Restoration(CMWSSB-UGD CUT) of CC Road at Teachers Colony main road (CC Road) (Pumping line 150m) in Dn - 194, Unit -44, Zone - 15.
Repairs and Improvements to Existing Old Viewcutters at Siva elango salai, Karthikeyan salai, Jeganathan salai and various streets in Division-68, Unit-16, Zone-6
Improvements to Existing Bus shelters at Siva Elango salai (Infront of K5-Peravallur Police Station Office) and Venkatraman Salai(Infront of Periyar Nagar BSNL Office) in Division - 68, Unit-16,Zone-6.
Formation of Greater Chennai Corporation Roadside Park at Chandrayogi Samathi street in Division-74, Unit-17, Zone-6
Repair and Improvements including Auditorium Terrace seepage repair work, Painting, Art work,etc, at Jawahar nagar 2nd cross street Greater Chennai Corporation playground in Div-68,Unit-16,Zone-6
Restoration of road cut made by CMWSSB at Mehta Nagar SPS to Bank Colony SPS in Div-25, Unit-7, Zone-3
Restoration of road cut made by CMWSSB to BT Surface at Govind Street in Div-29, Unit-8, Zone-3
Restoration of road cut made by CMWSSB to BT Surface at Periya Salai 1st Cross Street in Div-29, Unit-8, Zone-3
Restoration of Roadcut made by CMWSSB at Bandhi Venkatesan street in Div-116,U-27,Z-9
Improvement to the Footpath at Luz Avenue 1st Street Div-123, U-25, Z-09
Repair and maintenance work of Whites road park in Division-111, Unit-24, Zone-9
Repair and Maintenance of Amma Unavagam at M.S Koil Street in Dn-50, Unit-12, Zone-5.
Construction of Additional Cluster Kitchen at S.N Chetty Street in Div - 50, Unit - 12, Zone - 5.
Construction of Storm water Drain along DrAmbedkar Nagar 6th Main Road TNHB Colony 3rd Main Road Part TNHB Colony 1st Avenue Dn 175 Zone 13
Relaying of BT Road at Kapaleeshwarar Nagar South 4th Main Road in Dn.192,U-44,Zone-XV
Desilting of Railway Culvert (3 No.s) and Sump (3 No.s) at Railway border road and various streets in Div-132, Unit-31, Zone-10.