Loading…
Loading…
5,538 results • Latest
Providing of HDPE pipe at Vegeterian Village in DN-23, Unit-6, Zone-03.
Providing Handrails to the existing Footpath at GNT Road near St. Annes College (from 0.00m - 160.00m) in DN-29, Unit-8, Zone-3
Providing Handrails to the existing Footpath at GNT Road near St. Annes College (from 160.00m - 320.00m) in DN-29, Unit-8, Zone-3
Repairs and Improvements to the footpath at Balaji Nagar 1st street (East) in Div-119, Unit-24, Zone-09
Annual Maintenance for park at Indira Nagar 4th Cross Street Park in Dn-175, Unit-40, Zone-13 ( 1 Year)
Providing Pipe line for removal of rain water at Akbarabad 1st street 9(from Gopal menon road) in Dn.132, Unit-31, Zone-10
Providing gym equipment and maintenance work to gym building at Ashoka Street in DN-33, Unit-08, Zone-03
Providing play equipment at Teachers Colony 4th Cross Street Park Childrens play area in Div-33, Unit-8, Zone-3 (Under MC Fund 2025-26)
El.D.C.No.North/4729/2025 / Supply and Replacement of 3289 Mtrs of cable, Replacement of damaged pillars, construction of pedestal and painting of lamp posts at various locations in Div 17, Zone 2
Additional work to the proposed community hall at anna colony 2nd street in Division-179, Unit-38, Zone-13.
Construction of Multi-Purpose Hall at Ashoka Street in DN-33, Unit-08, Zone-3 (Under MC Fund 2025-26)
Provision of 10 Nos of 9.5 mtr street lamp post at the entrance of Madhavaram Lake in Div-27, Zone-3
Repairs to the existing Collapsed Stormwater drain at New Street in Dn.132, Unit-31, Zone.X
Laying Interlocking Block at BB Road 2nd street in division-121,unit-27, zone-9. (Under MLA Fund)
Provision of 9 Nos of 9.5 mtr and 1 no 8 mtr octogonal lamp post at the Parking of Madhavaram Lake in Kamarajar Salai Div-27, Zone-3
Improvements to the Urban Health And Wellness Centre at Lloyds Road in div-121, unit-27, zone-9.
Attending Patch work using M30 grade concrete at various streets in Div-130 , Unit-29, Zone-10
Fabricating Supplying and installation of Puf Sheet for waiting Area of Madhavaram ERI at Kamarajar Salari in DN-27, Unit-7, Zone-3
Proposed Construction of Compound Wall, Main Entrance Arch other Development works of UCHC Additional Construction of 3rd Floor of UCHC and Fire Fighting, Medical Gas Line Pump Room Sump of UCHC at Kondithopu Basin Bridge road in Dn 53 Zn 5
Attending Patch work using M30 grade concrete at various streets in Div-132 , Unit-31, Zone-10
Supplying, Fabricating and fixing in position of Ms Container for Ticket Counter and Store Room, Food Kiosk and First Aid Room for Madhavaram ERI at Kamarajar Salari in DN-27, Unit-7, Zone-3
Supplying and Fixing of Stainless steel handrail along the pathway and Other Improvement works to blue flag beach entrance in Div-114, Unit-27A, Zone-09.
Paving parking platform with bollards and Providing Children play Apparatus for Madhavaram Eri at Kamarajar Salai in DN-27, Unit-7, Zone-3
Providing Speed Breakers as per IRC Standard at Thanikachalam Nagar 80 feet road and other various streets in DN-29, Unit-8, Zone-3
Annual Maintenance for park at Dhandayuthapani Park and Senior Citizen Park in Dn-172, Unit-40, Zone-13 ( 1 Year)
Construction of Bus Terminus and Time Keeper Room at Vivekanadar illam at Dr. Besant Road in Dn-116,Unit-27, Zone-9.(Under MLA Fund)
Providing and Laying of 300 mm DWC Pipeline at Nandanam 1st Main Road Connecting Lotus Colony 2nd Street and Nandanam Canal, Div.122, Unit 26, Zone 09.
Annual Maintenance of Park at Thiruvalluvar Nagar 2nd main road, Thiruvalluvar Nagar 43rd cross street park in Dn-182, Unit-38, Zone-13 ( 1 year)
Restoration of Road Cut ( CC Road ) made by CMWSSB For UGSS and WSS at Ranga Reddy Garden 1st Cross Street extn in Dn - 192, Unit -44, Zone - 15.
Minor repairs works assured minimum facility to be provided in polling booths in div-124, Unit-25, Zone-09
Supplying and laying of 12 PVC Pipe in Annai Avenue 2nd Street in Div-195, U-45, Zone-15
E.L.D.C.NO/SM II/P3/54/ 2026 Removal of damaged 20mtr HM and Supply Commissioning of 1 no. of 16 mtr HM with 150 W LED FL fittings at New Beach Road Thiruvanmiyur in DIV 180 Zone13
Minor repairs works assured minimum facility to be provided in polling booths in div-121, Unit-27, Zone-09
Supplying and laying of 8 PVC Pipe for Annai Avenue 1st street in Div-195, U-45, Zone-15
Minor repairs works assured minimum facility to be provided in polling booths in div-126, Unit-25, Zone-09
Minor repairs works assured minimum facility to be provided in polling booths in div-122,u-26
RESTORATION OF METRO WATER CMWSSB B.T. ROAD CUT PORTION AT ALWARPET STREET IN DN-122, UNIT-26, ZONE-09
Restoration of Road Cut ( CC Road ) made by CMWSSB For Replacement of water Distribution mains at Kannagi Nagar 8th and 9th cross street in Dn - 196, Unit -45, Zone - 15
Proposed Sculpture Podium and hardscape surface at Marina Beach Promenade in Division 116, Unit 27A, Zone 09
Restoration of Road Cut ( CC Road ) made by CMWSSB For Replacement of water Distribution mains at Kannagi Nagar 54th and 55th cross street in Dn - 196, Unit -45, Zone - 15
Imrpovement works to Animal Birth Control center by Providing Care taker room, toilet, Roofing sheet work, Floor rising works, Compound wall rising by roofing sheet and Painting work in Dn-199,Unit-44,Zone-15
Formation of footpath and providing Interlocking Paver Block at Lotus Coloney 2nd Street North Side in Div 122 Unit-26 Z-9
Repair And Improvements to the Old Age Home at T.T.K Road in Division -119, Unit -24, Zone -9.
Supplying and erecting in position LIGHT DUTY STEEL Truss Work and Electrical arrangements for Manjapai Vending Machine at Model School Road (Opp to Nilgiris supermarket) in Dn-199 Unit-44 Zone-15
Proposed Construction of Health and Welness centre at pandurangapuram main road in Division-88,unit-19, zone-7.
Annual Maintenance of Buildings, Roads, Footpath, Public Conveyance, Parks, Play Grounds, Burial Grounds and other works in Div-199,Unit-44,Zone-15
Annual Maintenance of Park at Tiger Varathachari salai, CGE colony, Yamuna street Park in Dn-181, Unit-38, Zone-13 ( 1 year)
Formation of footpath and providing Interlocking Paver Block at Lotus Coloney 1st STREET Road West side in Div 122 Unit-26 Z-09
Proposed construction of Stainless steel Bus Shelter (6m x 3m) at Ennore Express Road in Div-01, Unit-01, Zone-01. (Under Councilor fund- 2025-26)
Annual Maintenance of Park at AIBEA Nagar (Devandra Nagar), Kannappa Nagar Park in Dn-182, Unit-38, Zone-13 (1 year)