Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
6,494 results • Latest
Construction of Rain Water Harvesting system in M and nd CW Center Welcome in Ward No224 Welcome Colony in AC-64 under EE( C)-5
Improvement of Electrification System with allied works at Barat Ghar under the Division of EE(SDW)-IV
Replacement of Old damaged AC/PVC/CI water pipeline from tubewell at sarangpur road to Malikpur Village by P/L/J 150 mm dia DI Water line in Najafgarh Constituency under EE(C)-27
Modification in LT panel room and other allied works at Nilothi SPS under ISP Package-2
Shifting of 1500 mm dia Rising Main PSC line Emanating from Pargati Vihar SPS Rising Main at Crossing CISF land Near IGL filing Station CGO Complex under EE(Civil)Plant SDW S/E
Servicing of Morris make 5 TON crane installed at CWPH 3rd 40 MGD plant at Wazirabad water Works.
CORONET ISI 15 Single lever pillar mounted sink mixture with swivel spout
PARAS PVC Coated Polyester Canvas Canvas Water Tank, Body Diameter Base 2570 millimeter
PARDO Flexible Drain Hoses for Wash Basins/ Sinks Threaded PVC 40 mm 1.5 meter
Unbranded Wash Basins - Vitreous Sanitary Appliances (Vitreous China) Angle Back 600 mm × 480 mm x 290 mm Centre Tap Hole, Unbranded Wash Basins – Vitreous Sanitary Appliances (Vitreous China) Angle Back 600 mm × 480 mm x 290 mm Centre Tap Hole
Unbranded Precast Concrete Manhole Cover and Frame (V3) Conforming to IS 12592 Medium Duty - 10 (Circular) 500 mm
Augmentation of water supply by providing 100mm dia. Water line and making interconnection on main Shani Bazar road near Gayatri Jewellers in Ward 39 AC-09 Kirari under EE(C)-20.
Augmentation of water supply in west cabin Block by making 100 mm Dia interconnection from 70 feet Road in Kirari AC-09 under EE(C)-20/SE(C)-08.
Providing and laying / Interconnection of sewer lines in left out portion in ward 36 Nilothi and in Mundka - AC-08 under EE(C )-35. (Re-invited)
Hiring of Desiliter mounted on three wheeler for removal of silt from Manholes of the sewer lines in ward 36 Nilothi Mundka AC-08 under EE(C)-35.
Hiring of suction bolero jetting machine 1500 ltr capacity bolero machine for removal of sewer blockages in ward 34 Nilothi in Mundka AC-08 under EE(C)-35.
Hiring of suction bolero jetting machine 1500 ltr capacity bolero machine for removal of sewer blockages in ward 36 Nilothi in Mundka AC-08 under EE(C)-35.
Deployment of Staff at New Avantika BPS Rohini HT BPS in AC 06.
Power Control Center (PCC) Panel for Power Distribution (Q3) (3 (3 ))
Box Strapping Machine (Q3)
Steel Pipes for Water and Sewage as per IS 3589 (Q3) (3 (3 ))
Submersible Pumpsets (Three Phase) Conforming To IS
Submersible Pumpsets (Three Phase) Conforming To IS
PVC Insulated Cable For Submersible Pumps ISI Marked To IS 694 (Q2) (3 (3 ))
Sluice Valve For Water Works Purposes (50 To 1200 Mm Size) (V2) As Per Is 14846 (Q3) (3 (3 ))
NIT No. 2(2026-27)/EE(C)Dr-III
Deployment of staff for operation and minor maintenance of EandM equipment at RampuraSPS.
Deployment of staff for operation and minor maintenance of EandM equipments installed at Nangloi SPS.
Deployment of staff for operation and minor maintenance of Sewage Pump and allied EandM equipment at Avantika SPS.
Deployment of unskilled staff at Haiderpuri SPS and Rithala Admin Block.
Engagement of un-skilled/skilled workers on contract basis for repair/maintenance for various Staff Qtrs., Bunglows, Plants and Offices under EE(C)Plant,WW-II.
NIT No. 02 / EE (C) DR - XI (2026-27) Item No. 3
Repairing of defective Air Circulators and exhaust fans installed at Haiderpuri SPS including allied electrical works.
Repairing of LRS foundation set no.1,2,3 and 4 at Shalimar Bagh SPS.
Replacement of old damaged outlived and undersize sewer lines by SN8 HDPE sewer line in P and J Block, Vishnu Garden in Chowkhandi Nagar ward no. 97 in Rajouri Garden Constituency under EE(C)-19.
Renovation repair of foundation of 33MGD pump set no.1 at Sector-9 SPSRohini
Improvement of water supply system by making interconnections form existing main feeding water line of 1100,600,500,400 mm DI/ CI/ MS Water lines in Mundka AC -08 under EE(C)-35/SE(C)-03
Providing and fixing MS Jaali gate for locking arrangement of quarters for security purpose in varun Niketan Staff Qtrs. under EE(C)Plant,WW-HP.
Construction of road from Raw Water PH-I to NDPL Sub-station at Haiderpur WW under EE(C)Plant,WW-HP.
Supply, Installation, Testing and Commissioning of HT Switch Board/ Pannel at Kondli Gharoli SPS
Periodic maintenance of Type-IV Staff Qtrs. at Varun Niketan Staff Colony under EE(C)Plant,WW-HP.
XLPE Cable for Working Voltage up to and Including 1.1 KV Marked To IS 7098 (Part 1) (Q2), LED Luminaire For Floodlight Conforming To IS 10322 (Part 5/Section 5) (V3) (Under BIS Scheme - II) (Q2) (3 (3 ))
XLPE Cable for Working Voltage up to and Including 1.1 KV Marked To IS 7098 (Part 1) (Q2), LED Luminaire For Floodlight Conforming To IS 10322 (Part 5/Section 5) (V3) (Under BIS Scheme - II) (Q2) (3 (3 ))
Maintaining water supply of Tube Well in Suraj Park area in AC 13 by Automation and Supervisor.
Maintaining water supply by deployment of staff at various BPS in Sec-18 Rohini AC-13.
Maintaining water supply by deployment of staff at various BPS in Sec 7 , 18 and 19 Rohini in AC 13.
Maintaining water supply by deployment of staff at various BPS in Sec 7 Rohini.
Maintaining water supply by deployment of staff at various BPS in G and F block Sec. 15 and Sec 18 Rohini in AC-13.
Deployment of staff at Khadda Basti Raja Vihar SPS in AC 13.