Loading
Loading…
Loading…
6,362 results • Latest
Deployment of staff for operation, watch and ward of Booster pumping station at BD Block Mayur Vihar Phase-II
Fabrication/ Making and Fixing of MS reducer at delivery line at Mandawali B.P. Station-I
SITC of 800 Amp ACB in LT panel (LT Make) installed at Geeta colony BPS.
SITC of 25 HP pump sets at BD Block Online Booster Pumping station
SITC of Chemical Dosing pump at 23-Block Trilokpuri BPS.
SITC of CMS system at 23 Block Trilokpuri BPS.