Loading…
Loading…
5,972 results • Recent activity
Improvement of water Supply Removing of contamination by replacement of 100 mm dia old and rusted water line from H.no.C-6/1 to C-6/21 at Model town in AC-18 Model town Constituency under EE(C )-13.
Replacement and upgradation of old sewerage system by 400 mm dia SN8 DWC HDPE Pipe from C-1 to D-13A/18 in Model town in AC-18 model town under EE(C )13.
Boring and Installation of 1 No. Tubewell at C-Block Rana Pratap Bagh in Model Town Constituency AC-18 Under EE (C)-18
Shifting of sewer network of Dharampura Lodge in Kamla Nagar ward no-69 in Model Town Constituency AC-18 under EE(C)-18
Desilting of Wet Sumps / Dry Sumps and Channel at C-9 SPS Vasant Kunj.
Construction of roof top rain water harvesting system at various DUSIB installations/offices under catch the rain compaign in Mundka AC-08under EE(C)-35/SE(C)-3.