Loading…
Loading…
6,864 results • Recent activity
Tourniquet Machine (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2025/B/6551641 Dated : 25-08-2025 Bid Document 1/9, -- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 11000 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 28 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : DIRECTOR ACTREC Tata Memorial Centre - Advanced Centre For Treatment, Research And Education In Cancer (actrec), Department 2/9 of Atomic Energy, N/A, PMO (Director Actrec) Splitting
Custom Bid for Services - Hiring of Vehicles for Scheduled Trips - Sedan Car, Hatchback Car, 12 Seater and 41 Seater Bus Similar Category Vehicle Hiring Service - Per Vehicle-Day basis
Supply of PLC based system as per our specifications
Digital Storage Oscilloscope (Q3) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
Microchannel Plate based Photomultiplier Tube
Industry Unit; Sl No 10 Modification and fabrication of Structural Steel Support structure as per suit to site condition; As per tender conditions, Repair, Maintenance, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Sl No 11 Fabrication and erection of Structural Steel Support structure including supply of structural material (Carbon Steel) as per the site requireme.., and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Sl No 12 Cutting, removal and shifting of temporary structural steel support structure provided for sodium pipelines at RCB and SGB 1 and 2; As per tend.., and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Sl No 13 Removal of hydraulic snubbers from pipeline, including removal of pipe support clamps at various elevations inside RCB and SGB 1 and 2; As per t.., and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Sl No 14 Refixing of hydraulic snubbers on pipeline, including installation of pipe support clamps at various elevations inside RCB and SGB 1 and 2; A.., and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Sl No 15 Erection of sodium pipe Support with support clamps; As per tender conditions, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Sl No 16 Load adjustment of Spring support variable in Sodium system at SGB 1 and 2; As per tender conditions, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Sl No 17 Installation and removal of scaffolding (including arrangement of scaffolding pipes, jolly and clamps) upto 10m height with retention period o.., and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Sl No 18 Radiography testing using Se 75 Ir 192 as per site requirements; As per tender conditions, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Sl No 19 Fabrication and supply of 3 bolt clamp - type RP5 15 2 570; As per tender conditions, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Sl No 20 Fabrication and supply of 3 bolt clamp - type RP5 20 2 570; As per tender conditions