Outsourcing of Labour Part for strengthening the distribution system by replacement of 8 mtr poles with 9mtr. replacement and augmentation of 4C LT cables, PVC cables, removal of low-lying PVC lines along roads and crossings, ensuring statutory groun
Labour Outsource Works for FY 2027 28 under DS Division Sub Urban under DS Circle Patiala
Executing work of 66 KV line for Shifting of 66 KV idle Ferozepur Road to Adda Dhakha line on Request of Madhuban Enclave Welfare Society
Construction of All Technical civil works at new 66 KV Sub-Station Sotla (Under operation circle Hoshiarpur).
For Supply and Delivery of 100no. 11kV Differential/ Metering CT for various Substation of PSTCL.
Repair and Repainting of steel railings of VR DR Bridges at RD 3509ft RD 5780ft RD 12128ftRD14975ft RD19410ft RD 25575ft RD 29683ft RD 41250ft RD 65640ft of UBDC hydel channel during 2026 27
Labour Outsource Works for FY 2027 28 under DS Division Model Town Patiala under DS Circle Patiala
Labour Outsource Works for FY 2027-28 under DS WEST Division Patiala under DS Circle Patiala.
Procurement of BOILER HP VALVES and ITS SPARES which will be used in 2x270 MW BHEL
Addition Alteration in SHB to accomodate extension in 11kv control room at 132 kv s/s Shamashpur
R and R for the office building of DS sub division Sanour under East Division PSPCL, Patiala
Supply and Delivery of ISI marked 1.1 kV LT XLPE Insulated, PVC Sheathed, Aluminum Conductor unarmoured cable of size 4Cx50 sq. mm
Outsourcing of Labour Part of LT/HT Network Safety Compliance and System Strengthening Project by upgrading the LT/HT distribution infrastructure to ensure full compliance with statutory safety clearances as mandated by relevant electrical safety
Award of Service Contract for Servicing and overhauling of Pneumatically Operated Actuators and Cylinders at both the Units of GVK Power Goindwal Sahib Ltd
Procurement of Boiler Tubes used in 270 MW BHEL Units
Procurement of HOT AIR CONTROL DAMPERS for Coal Mills
Procurement of GLAND PACKING SET OF BOILER HP VALVES
Procurement of ESP Spares for 270 MW BHEL Unit
7886/P-1/EMP- 13423 dated 23.10.2026 Procurement and replacement of various types of Fire extinguishers such as ABC type, CO2 type, and Mechanical form type for firefighting services at GGSSTP, Rupnagar.
Procurement of BOILER TUBES PROTECTION SHIELDS
Procurement of Carbon Steel Plant 6 mm Sail Hard
Award of Service Contract for Checking, Servicing, Calibration and Other overhauling Jobs of Instruments at both the Units of GVK Power Goindwal Sahib Ltd
Outsourcing of Labour Part for Erection, Testing and Commissioning of New 11KVLT/HTLines on Rail/PCC Poles, Distribution T/Fs, Augmentation/Sagging of ACSR of HT/LT Lines, Cables laying, Guarding, Stay Setfor Various Works .
Outsourcing of Labour Part for Erection, Testing and Commissioning of New 11KVLT/HTLines on Rail/PCC Poles, Distribution T/Fs, Augmentation/Sagging of ACSR of HT/LT Liness, Cables laying, Guarding, Stay Set for Various Works
Construction of 1 No.66 KV Bay and allied civil works at 66 KV S/S Sekhupura (Under Operation Circle Mohali)
Outsourcing of Labour Part for Erection, Testing and Commissioning of New 11KVLT/HTLines on Rail/PCC Poles, Distribution T/Fs, Augmentation/Sagging of ACSR of HT/LT Lines, Cables laying, Guarding, Stay Set for Various Works.
Addition alteration in SHB to accomodate extension in 11kv control room at 132 kv ss Seh
Construction of 220kV Substation Toot(to be upgraded from 66kV)
Construction of addl. Bay (From 220kv s/s Handiaya 2nd circuit) and allied civil works at 66 KV S/S Barnala( Under Op. circle Sangrur). (Under RDSS)
Procurement Email and Office 365 Licenses
Procurement of Various Types of Tubes and Fittings
AMC Services for carrying out Environmental monitoring and testing in and around the plant.
Procurement of over-running clutch for MDU of air- preheaters of unit 3,4,5 and 6 at GGSSTP, Roopnagar .
Supply, Erection, Testing and Commissioning of CO Analysers for Unit 3 to 6 at GGSSTP, Ropar.
Procurement of Temperature and Pressure sensors installed in TG and other BTG area
Procurement of Turbo Supervisory Instruments and Accessories
Construction of boundary wall and UC Fencing at 220kv s/s Khasa
Maintenance of division office at 132kv s/s Kapurthala
Construction of DS Division and DS Sub urban Sub Division office Building Rampura at 66 KV Sub Station Complex Rampura
Recasting of roof slab at 66Kv Sub Station Boha O and M Division Mansa
Construction of extension (Addition and renovation) of SHB at 66 kv S S Abohar O and M Division Fazilka
Liaison work of quantity materialization as per MSQ and transit loss minimization of ROM/washed coal and covering of Tarpaulin on coal rakes loaded from CIL sources for all the thermal power plants owned/to be owned by Punjab State Power Corporation
Procurement of Turbine Speed Sensor
Service of condenser tube cleaning HP Jetting and bullet shooting in both 270 MW BHEL Units during Annual overhauling for Both the Units of GVKPGSL Goindwal Sahib
7883/P-1/EMP- 13459 dated 19-10-2026 for Procurement of Heavy Chemicals.
Appointment of representative agency for witnessing the third party sampling to be carried out by the third party and analysis of the part-3 of the sample prepared by the third party for coal supplies from CIL and its subsidiaries, at the loading
Work of replacement of t-clamps with c-wedge clamps (0.4-0.4 sq. inch, 0.2 sq. inch) alongwith change of jumpers (wherever required) on 220/132/66kV Busbars at various substations under P and M Circle jalandhar
Outsourcing of Labour Part to rectify low-lying PVC cables at road/street crossings under City area of City Sub division Hoshiarpur in City division under Circle Hoshiarpur
Strengthening of existing pile type foundation/ open pit foundation for various towers of 220kv rtp- jadla DC line under AOTL s/d Ropar