Project to reduce Disaster Risk and its Impact by construction of River embankment in between RD 25000-41000 on L/s bank of river Swan in distt. Rupnagar
Project to reduce Disaster Risk and its Impact by construction of River embankment in between RD 43000-45000 on R/s bank of river Swan in distt. Rupnagar
Project to reduce Disaster Risk and its Impact by construction of River embankment in between RD 11500-12500 on R/s bank of river Swan in distt. Rupnagar
Project to reduce Disaster Risk and its Impact by construction of River embankment in between RD 37000-39000 on R/s bank of river Swan in distt. Rupnagar
Project to reduce Disaster Risk and its Impact by construction of River embankment in between RD 47500-49000 on R/s bank of river Swan in distt. Rupnagar
Project to reduce Disaster Risk and its Impact by construction of River embankment in between RD 9500-10000 on R/s bank of river Swan in distt. Rupnagar
Project to reduce Disaster Risk and its Impact by construction of River embankment in between RD 3000-4000 on R/s bank of river Swan in distt. Rupnagar
Construction of Head Regulator of Rajindergarh minor offtaking at RD 64594/R of Rajpura Distributary
Estimate for Clearing Jungle Sarkanda and Berm from inner side slopes of Bikaner Canal from RD 180000 and 270730
Estimate for Clearing Jungle, Sarkanda and Berm from inner side slopes of Bikaner Canal from RD 270730 and 368500
Construction of Head Regulator of Saraibanjara minor offtaking at RD 91370/R of Rajpura Distributary
Estimate for Cement Concrete Lining of Keriyan Minor (with 20 Percent Enhancement) Slice RD 22800-42470 Including Pucca Structure.
Estimate for Cement Concrete Lining of Roran Wali Disty (with 20 Percent Enhancement) RD 0-11000 including pucca Structure
Estimate for Cement Concrete Lining of Keriyan Minor (with 20 Percent Enhancement) Slice RD 0-22800
Estimate for Relining/Reconstruction of Water Courses of Outlet RD 185823/R of Main Branch.
Estimate For Relining/Reconstruction of Water Courses of outlet at RD 14039/R of Tarobary Disty.
Estimate For Reconstruction/Remodelling of Watercourses of Outlet 55712/R of Tarobary Disty.
DISPOSAL OF BEML REAR DUMPER, CHAIN DOZERS, BEML WATER SPRINKLER, ASHOK LEYLAND HIPPO, TATA TRUCK,ETC.
E-PROCUREMENT OF GENERAL STOCK ITEMS OF THE RANJIT SAGAR DAM PROJECT.
Estimate for Construction of Boundary wall , Store and Office Room and Provision Of Vaccum Pumps at Pump House Of NardMissewal -Chikna Lift Scheme at RD 32300/L of A.S.H.C
Reconstruction/Relining of watercourse at RD 11371/R of 2-R Disty
Estimate for CC lining of Akash Disty from RD 0-11800 including other Allied works.
Estimate for CC lining of Akash Disty from RD 11800-20000 including other Allied works.
Relining and Lining of Watercourse by Brick Masonary of Outlet RD 7274TL of Mr No4 VillageSatikeDistt Mansa
Estimate for Brickwork Lining of Watercourse and Laying U/G Pipeline of Outlet at RD 12000/R of Malaudh Disty
Relining and Lining of Watercourse by laying UGPL of Outlet RD 18643R of Biroke Branch Village SatojDistt Sangrur Laying and Jointing of RCC UGPL system and other allied works in construction of watercourse
Leasing land for developing house boat at Spur no 2 at left bank of river Satluj at Ropar
Leasing out land for developing restaurant etc for Tourism purpose near Nehru Stadium Ropar after dismantling of abandoned quarters.
Estimate for Boundary Wall of Drainage dept. land.Banur Sub Division, Village Dhkauli , Zirakpur
Construction of New Ladies Washroom in lieu of Existing Washroom in the Office Premises of Drainage cum Mining and Geology Division Patiala
Laying in take pipeline from RD 152340/L of Narwana Branch along with construction of sump well and Haudi
Estimate for Lining of Watercourses of O/L RD 84900/L of BDC by laying of UGPL of Vill. Uladni, Jhungian, Lalpur, Kangna Bet
Estimate for Lining of Watercourses of O/L RD 69980/R of Phagwara Mr. by laying of UGPL of Vill. Barn, Kishanpur
Estimate for Lining of Watercourses of O/L RD 41200/R of Phagwara Mr. by laying of UGPL of Vill. Bishanpur
Estimate for Lining of Watercourses of O/L RD 38750-L of BDC by laying of UGPL of Vill. Jamitgarh, Aima, Chahal, Bir Sarkar
Estimate for the Hiring of Staff for Function of Beldars/Work Mistry/Mate/Gauge Reader in Head works Sub Divisions Ropar
Estimate for Brickwork lining of watercourse at RD 3161 L of Tajpur Minor
Boating at Neelon bridge RD 162000-164000
Boating activities in between RD 60400-61900 of Bathinda Branch
Laying of Riser Main pipe from RD 3353 to 4877 along with distribution pipeline for Kapuri lift scheme off taking from RD 152340/L of Narwana Branch
Laying of Riser Main pipe from RD 1829 to 3353 along with distribution pipeline for Kapuri lift scheme off taking from RD 152340/L of Narwana Branch
Estimate for Laying 250 mm Dia UPVC U/G Pipe line for O/L RD 6000/R, and 7400 /R of Shahpur kandi channel no. 3 for year 2026-27.
Laying of Riser Main pipe from RD 4877 to 6401 along with distribution pipeline for Kapuri lift scheme off taking from RD 152340/L of Narwana Branch
Estimate for Laying 200mm Dia UPVC U/G Pipe line for O/L RD 1500/R, 4500/R and 5500/R of Shahpur kandi channel no. 4 for year 2026-27.
Laying of Riser Main pipe from RD 0 to 1829 along with distribution pipeline for Kapuri lift scheme off taking from RD 152340/L of Narwana Branch
Estimate for Laying 200 mm Dia UPVC U/G Pipe line for O/L RD 11400/R AND 12500/L Of Shahpur kandi channel no. 4 for year 2026-27.
Estimate for Laying 200mm Dia UPVC UG Pipe line for Outlet RD 100/L, 3050/L and 5500/R of Shahpur kandi channel no. 3 for year 2026-27.
Estimate for Laying 200 mm Dia UPVC UG Pipe line for OUTLET RD 14150 R Of Shahpur kandi channel no. 3 and Outlet RD 9500 R channel no. 4 for year 2026-27.
Supply, Installation, Commissioning, and 5-Year Operation and Maintenance of 200 HP Pump Sets, Vacuum Pumps, Valves, Pipes, and Electrical Panels for Lifting Water from Sirhind Canal RD 145700R into Neelon Drain
Construction of Pump House and Control Room, Construction of Sump Well, Lining of Sirhind Canal and Neelon Drain, Construction of Protection Works at Outfall of Riser Main, and Joining of NP3 700 mm Dia Pipe with Sump Well for Construction of Surface