Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
998 results • Latest
Farm Ponds, Percolation Tank
Farm Pond MJSA-III Phase
Farm Pond MJSA-II Phase
Construction of various water harvesting structures in GP Cheebi, Chidiya and Uttarani P.S.- Gida Distt Balotra Under MJSA-2.2
Construction of Various Watershed Development Structures under MJSA 2.0 PHASE II , P. S. Sheo, District Barmer
Construction of various Watershed development structures under MJSA 2.3 in Block Aau
Construction of various Watershed development structures under MJSA 2.3 in Block Bapini
Construction of Various Watershed Development Structures under MJSA 2.0 PHASE II , P. S. Gadraroad, District Barmer
Construction of PCD (02) under MJSA 2.0 Phase-II P.S. Chhabra
Construction Of FARM POND WITH PLASTIC MULCH
Construction of Anicut, Pakka Checkdam
Construction of Bnak Stablisation,peripheral bund,earthen check dam
construction of ecd mpt cct dcct
construction of anicut under MJSA 2.2 samiti fund
Watershed Development Work Tanka 30 Cum (48 No.) Total 48 Work.
Animal feeding Manger Livestock Management
Watershed Development Work Tanka 30 Cum (40 No.) Total 40 Work.
Watershed Development Work Private Tanka 30 Cum (35 No.) Johad (01 No.) Total 36 Work.
Watershed Development Work Private Farm Pond (20 No.) Total 20 Work.
Animal feeding Manger Livestock Management
Miawaki Block Plantation Fruit Production Agro Forestry Plantation
WATERSHED STRUCTURES
Construction of Various Watershed Development Structures under MJSA 2.0 PHASE II, P. S. Dhanau, District Barmer
Anicut(09) AND Pakka Check Dam(03) At G.P,Moreela,Malpur PS-Jhallara ( MJSA 2.2)
CONSTRUCTION OF MPT(50), ECD (4), CCT(8), DSMP(11) IN G.P.SEMARI, INTALI, CHANDORA, SHYAMPURA SEMARI, KURADIYA, SURKHAND KHERA, BADAWALI PS SEMARI ( BY MJSA- 2.0 PHASE-III)
CONSTRUCTION OF CCT(13), DSMP (6), MPT(39) IN G.P.BALUA, KHARBAR A-B, NIMBODA, PARSAD PS SARADA ( BY MJSA- 2.0 PHASE-III)
CONSTRUCTION OF PAKKA CHECK DAM (2) IN G.P.BALUA PS SARADA( BY MJSA- 2.0 PHASE-III)
CONSTRUCTION OF MINI PERCOLATION TANK(84) AT GP DAIKHEDA,DEVLIYA, DHOLIYA, KHAJURI, OVRA OF PS- LASADIYA DISTRICT SALUMBER ( BY MJSA 2.0 PHASE 3)
CONSTRUCTION OF MINI PERCOLATION TANK(56) AT G.P BANORA,AAMLAWA,MALPUR OF PS-JHALLARA DISTRICT SALUMBER ( BY MJSA 2.0 PHASE 3)
CONSTRUCTION OF MINI PERCOLATION TANK , MPT AND RTWHS IN GP BAGURWA , DHAWADIYA, ODA,KEWADA KHURD, PADALA, SINGTAWADA,ADWAS ,NEVATALAI IN MJSA 2.0 PHASE-III PROJECT AREA PANCHAYAT SAMITI JAISAMAND DISTRICT SALUMBER (RAJ.)
CONSTRUCTION OF MPT(82), PRT(2), DSMP(4) IN G.P. GAWDAPAL,ORWADIYA, KARAWALI,ISARWAS, PRATAPPURA,KADUNI, KHARKA PS SALUMBER ( BY MJSA- 2.3)
CONSTRUCTION OF MPT(73), ECD(78), PRT(5) IN G.P. DHANKAWARA, KALI GHATI AND KANPUR, SHAKTAWATO KA GURA, SURKHAND KHERA, KUNDA, TOKAR, UDATFALA PS SEMARI ( BY MJSA- 2.0 PHASE-II)
CONSTRUCTION OF CCT (69) AND DCCT (29) IN G.P.DHANKAWARA, KALI GHATI AND KANPUR,SHAKTAWATO KA GURA,SURKHAND KHERA , KUNDA, TOKAR , UDATFALA PS SEMARI ( BY MJSA- 2.2)
CONSTRUCTION OF CCT(104), DCCT(85), DSMP(24), ECD(27), SGT(5) IN G.P. GINGLA, GUDEL, IDANA, JAWARDA, METHUDI, UTHARDA PS SALUMBER( BY MJSA- 2.0 PHASE-II)
CONSTRUCTION OF MPT(129) IN G.P. GINGLA, GUDEL, IDANA, JAWARDA, METHUDI, UTHARDA PS SALUMBER ( BY MJSA- 2.0 PHASE-II)
CONSTRUCTION OF BENCH TERRACING ( 71) , DRY STONE MASONARY POND (57) , CCT(05) , DCCT(05) AND MINI PERCOLATION TANK(02) AT G.P BANORA, MOREELA, MALPUR AND SARWANI PS- JHALLARA ( BY MJSA 2.2)
CONSTRUCTION OF CCT , DCCT, DSMP ,EARTHEN CHECK DAM, MINI PERCOLATION TANK AND WATER HARVESTING STRUCTURE IN GRAM PANCHAYAT ADWAS, JAWAD , GAMADI AND BAGURWA IN MJSA2.2 PANCHAYAT SAMITI JAISAMAND
CONSTRUCTION OF MPT (29) AT DHANKAWARA, KALI GHATI,SURKHAND KHERA, UDATFALA, KANPUR GRAM PANCHAYAT IN PANCHAYAT SAMITI SEMARI (MJSA2.2)
CONSTRUCTION OF ANICUT(1) AND ANICUT RENOVATION (1)IN G.P.BANA KALAN,NATHARA,PAL SARADA, SAGTRA, SARADA, SEPOOR, THANA PS SARADA( BY MJSA- 2.2)
CONSTRUCTION OF ANICUT (2),ANICUT RENOVATION (1) IN G.P.DHANKAWARA, KALI GHATI AND KANPUR, SHAKTAWATO KA GURA, SURKHAND KHERA , KUNDA, TOKAR , UDATFALA PS SEMARI ( BY MJSA- 2.2)
CONSTRUCTION OF CONTINUOUS CONTOUR TRENCHES AND DEEP CONTINUOUS CONTOUR TRENCHES IN GRAM PANCHAYAT ADWAS, JAWAD , GAMADI AND BAGURWA IN MJSA2.0 PHASE-II PROJECT AREA PANCHAYAT SAMITI JAISAMAND DISTRICT SALUMBER (RAJ.)
CONSTRUCTION OF PAKKA CHECK DAM(1) AND ANICUT(3) IN G.P. GINGLA, GUDEL, IDANA, JAWARDA, METHUDI, UTHARDA PS SALUMBER BY MJSA- 2.0 PHASE-II)
Construction of Compost Pit-05 PMKSY-2.0 PS Chhipabarod
Repair Work of Office Building of Department of Watershed Development and Soil Conservation Jodhpur
Charagah Vikas Karya Kakar
Khila Miyawaki plantation Work etc
construction of pakka checkdam, anicut, pt, cct
construction of anicut, anicut renovation, talab renovation , MPT, CCT
Construction of Anicut Renovation, Talab Renovation
construction of cct, mpt, rtwhs