| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹62.0 LAccepted-Finance | ₹62.0 L | L1 | Accepted-Finance L1 |
| 2 | L2₹65.6 L+₹3.7 L (5.92%)Accepted-Finance | ₹65.6 L+₹3.7 L (5.92%) | L2 | Accepted-Finance L2 |
Tender Value
₹62 L
EMD Value
₹1.2 L
Closing Date
11 Aug 2026, 5:00 pmClosed
Additional Chief Engineer
NEAR RTO OFFICE, BJS COLONY, JODHPUR
Repair Work of Office Building of Department of Watershed Development and Soil Conservation Jodhpur
2026_WDSC_579941_1
JODHPUR/DIV/OFFICE/02/2026-27
Open Tender
Civil Works
Percentage
45 days
JODHPUR
PLEASE REFER TENDER DOCUMENT
3 documents required · 3 mandatory
₹1,000
Secretary, RISL
₹1.2 L
Yes
15 Aug 2026
31 Jul 2026
12 Aug 2026
31 Jul 2026
11 Aug 2026
31 Jul 2026
31 Jul 2026 - 11 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2 | Part-A: Building Work:- Dismantling doors, windows and clearstory windows steel or wood shutter including chowkhats and holdfasts etc. complete and stacking within 50 meters lead :Of area 3 square meter and below. Doors. PWD BSR, 2022 14.12.1 | 8 | Each | 105 | ₹840 |
| 3 | Dismantling stone slab/ terrazo chip flooring laid in cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 meters lead. PWD BSR, 2022 14.25 | 282.93 | Sqm | 80 | ₹22,634.4 |
| 4 | Dismantling tile work in floors and roofs laid in cement mortqr including stacking of serviceable material and disposal of unserviceable material within 50 meter lead :For thickness of tiles 25mm to 40mm.Toilets. PWD BSR, 2022 14.23.2 | 118.91 | Sqm | 34 | ₹4,042.94 |
| 5 | Repairs to plaster of thickness 12mm to 20mm in patches of area 2.5 sq. metres and under including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete including disposal of rubbish to the dumping ground within 50 m lead With cement mortar 1 :4 ( 1 cement : 4 coarse sand).PWD BSR, 2022 13.10 | 1,952.85 | Sqm | 235 | ₹4,58,919.75 |
| 6 | Plaster on new surface on walls in cement sand mortar 1:6 including racking of joint etc. complete fine finish :25 mm thick. PWD BSR, 2022 12.3.1 | 216.37 | Sqm | 211 | ₹45,654.07 |
| 7 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. R.C.C. Chajja. PWD BSR, 2022 14.3 | 1.85 | Cum. | 930 | ₹1,720.5 |
| 8 | Repair to damaged RCC slabs, beams and columns etc for strengthening with cement mortar 1 : 2 in following steps :-
i) Choping loose and cracked concrete to required depth, cleaning the exposed surface of steel and concrete with wire brush and sand papering , cleaning of concrete surface with water as necessary and getting dried.
ii) Applying Epoxy primer on the exposed steel bars.
iii) Applying Epoxy hardener and resin mix (as per manufectured's specification) on concrete and steel bars with brush.
iv) Spreading dry cement mortar 1 : 2 mix over epoxy treated wet surface and allow it to dry for one day.
v) Plastering the surface with cement sand mortar 1 : 3 upto depth of 30mm complete.
vi) Cure the plastered surface for 15 days, All work including scaffolding etc. complete in all respect.PWD BSR, 2022 13.29 | 230.54 | Sqm | 1,568 | ₹3,61,486.72 |
| 9 | Earth work in excavation by mechanical means (Hydraulic Excavator)/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of soils . PWD BSR, 2022 1.8 | 60.71 | Cum | 178 | ₹10,806.38 |
| 10 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size).PWD BSR, 2022 3.1.6 | 138.8 | Cum | 3,302 | ₹4,58,317.6 |
| 11 | Random Rubble stone masonry for with hard stone in foundation and plinth in Cement Sand mortar above 30 CM thick wall in:Cement Mortar 1:6 ( 1-Cement : 6-Sand).PWD BSR 2022,6.1.6 | 21.26 | Cum | 2,838 | ₹60,335.88 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.78 MB
Tendernotice_2.pdf
PDF • 1.58 MB
BOQ_1030517.xls
BOQ • 0.34 MB
Corrigendum.pdf
PDF • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .