Loading
Loading…
Loading…
1 results • Latest
Construction of Boundary Post with Tie Beam of University Land at Dynijan area (Phase 3), D.U. (Civil Works)
Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge: All kinds of soil sqm