Loading…
Loading…
344 results • Latest
Construction of E-library Room and Sabhagar room at Advocat welfaire association tahsheel karchana
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. As per Code No. 2.8.1
GRAM KHANPUR MAI RCC NALA NIRMAN KARYA
Excavating, supplying, stacking and filling of local earth (including royalty) by mechanical transport upto a lead of Skm also including ramming and watering of the earth in layers not exceeding 20 cm in foundation trenches, plinth, sides of foundation etc. complete for all lift. DSR 2023 SL. No. 2.25(a) Page 94, V-1
GRAM KAILSHIKARPUR MAI SC BASTI MAI BARAT GHAR NIRMAN KARYA.
Clearing jungle Including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. As per S.1. No. 2.31 Page 95, V-1
GRAM MUNDET KALAN MAI PANI KI TANKI SE BHUMIYA KHEDE KE RASTE PAR CC ROAD NIRMAN KARYA
Construction of Embankment with Material Obtained from Borrow Pits construction of embankment with approved material obtained from borrow pits with a lift up to 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300,1 and 300.2 with a lead up to 1000 m as per Technical Specification Clause 301.5+S.J. No. 231(a)
GRAM MAHAVATPUR MAI BARAT GHAR NIRMAN KARYA
Clearing jungle Including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. As per S.1. No. 2.31 Page 95, V-1
GRAM MANTH-MANTHI MAI BARAT GHAR NIRMAN KARYA.
Clearing jungle Including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. As per S.1. No. 2.31 Page 95, V-1