Loading…
Loading…
Found 3 active tenders
3 results • Latest
As Above
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
As Above
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
purchase of ICP OES Inductively Coupled Plasma Optical Emission Spectrometer, other items accessories for the Soil Testing Laboratory Shimla Senior Analytical Chemist, H.P. Shimla 04 and STL Palampur, DDA Kangra, H.P.
Select, Excess (+), Less (-) Less (-)