Loading…
Loading…
5 results • Latest
CIVIL CONSTRUCTION WORK
BOUNDARYWALL Earth work in excavation of foundation inhard soil within 50m initial lead &1.5 M initial lift including rough dressing and leveling the bed and depositing the excavated materials away from the working areas as per specification and directon of Engineer in Charge
CIVIL CONSTRUCTION WORK
Setting up the piling gantry and connected equipment over each pile location, including cost of shifting, cost of all materials for (1000mm Dia Pile) piling gantry, labour, setting up the rig to alignment and correct dimensions as shown in the drawing and as directed by the Engineer-in-Charge.
CIVIL CONSTRUCTION WORK
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used and including cost of all labour, labour cess, T&P etc complete and as per direction of Engineer-in- Charge.
CIVIL CONSTRUCTION WORKS
Setting up the piling gantry and connected equipment over each pile location, including cost of shifting, cost of all materials for (1000mm Dia Pile) piling gantry, labour, setting up the rig to alignment and correct dimensions as shown in the drawing and as directed by the Engineer-in-Charge.
CIVIL CONSTRUCTION WORKS
Setting up the piling gantry and connected equipment over each pile location, including cost of shifting, cost of all materials for (1000mm Dia Pile) piling gantry, labour, setting up the rig to alignment and correct dimensions as shown in the drawing and as directed by the Engineer-in-Charge.