Found 17 active tenders
17 results • Latest
Parking campus in Indira Market Phase-I, First Floor, Second Floor, Third Floor(Terrace) having capacity of 150 vehicles for contract w.e.f 01-01-2 026 to 31-12-2028. The reserve price of parking is 25.Lac. Excluding GST. The rate of
Description of Work/Items(S)
C/O C.C. Pavement from near the H/O Sh.Jaswant Singh upto Khad No.1 in ward no.1 NP Gagret
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
C/O Cement Concrete wall in Choi No.1 upto NP Boundary in ward no.3 of NP Gagret
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
C/O C.C. Wall at Shamshan Ghat at Boundary of ward no.3 NP Gagret
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All Kinds of soil
Improvement of path from near the H/O Sh.Shakti Singh upto near High Mast Light in ward no.3 of NP Gagret
Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
C/O Front Boundary Wall with Gate at SWM Site Nagar Panchayat Gagret
Earth work in surface excavation not exceeding 30 cm in Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge