Loading…
Loading…
382 results • Recent activity
Providing, Arrangement and Fixing of 440V, 3 phase and Neutral 400Amps Distribution Panel for 440V power supply controlling of Hirakhand Bundia Mines, RSA, OA
Supply and fixing of grid spring for I/R Feeder breaker CHP LOCP,IBVA
Repairing of CCTV surveillance system at regional store and dispensary, LKPA
Repairing, Modification and Strengthening of Existing Fog Cannon Base Frame including Dis-assembly of Old Structure, Fabrication of New Steel Members, Cleaning and Painting of Frame, and Supply, Matching and Fixing of 50 mm GI Pipeline with Hydraulic
Vinyl flooring inside control room of 33KV/3.3KV Sub-station of Rampur Sub-Area Orient Area
Supply and Fixing the MCCB 400 Amp 415V urgently required for LOCP mines and adarshnagar colony.