Loading…
Loading…
811 results • Latest
Pole-Mounted Outdoor Dustbin (Q3)
Heavy Duty Hydraulic Operated Material Unloading Superstructure
Decorative Lightning Pole (V2) (Q3)
DOL starter (Q3) (3 (3 ))
Vertical Multistage Centrifugal Pump (Q3)
Suitcase (V2) (Q3)
Alumino - Ferric (V2) Conforming to IS 299 (Q3), Stable Bleaching Powder for Household and Industrial use (V3) conforming to IS 1065 (Part 1) (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
LED Luminaire For Floodlight Conforming To IS 10322 (Part 5/Section 5) (V3) (Under BIS Scheme - II) (Q2) (3 (3 ))
LED Luminaire For Floodlight Conforming To IS 10322 (Part 5/Section 5) (V3) (Under BIS Scheme - II) (Q2) (3 (3 ))
LED Based Information Display System (Q4)
Unbranded ABS Speed Breaker 500 millimeter mm
Unbranded Unipaver Medium-traffic Precast Concrete Blocks For, Unbranded Unipaver Medium-traffic Precast Concrete Blocks For Paving
Readymade Bituminous Pothhole Patching Mix as per IS 217 Cutback Bitumen, IS 14982 Anti - Stripping Agent (Q4) (3 (3 ))
LED Based Information Display System (Q4)
Professional Painting Service - Walls; Exterior Walls; NA
Handcrafted Showpiece and Statue (Q3) (3 (3 ))
Alumino-Ferric (V2) Conformingto IS299 (Q3)
xtrelectronics
Liabrary's Books
Stable Bleaching Powder for Treatment of Water Intended for Drinking (V3) conforming to IS 1065 (Part 2) (Q3) (3 (3 ))
High Mast Lighting Tower for large area with LED Flood Lighting System (Q3)
Submersible Pumpsets (Three Phase) Conforming To IS
Pressurized Potable Water Transportation Pipeline Assembly & Pipeline Connectivity Infrastructure Pa, Integrated Water Transfer, Flow Management And Pipeline Connectivity Infrastructure Package
Fabricated Special Purpose Vehicle on Truck/Van (Q3) (3 (3 ))
Unplsticized PVC Pipes for Water Supply conforming to IS 4985 (Q3) (3 (3 ))
Rigid GI Pipe (BHEL) (Q3) (3 (3 ))
INTEGRATED SECURITY SURVEILLANCE SYSTEM SERVICE - Supply, Installation, Testing & Commissioning of 16 Channel CCTV Surveillance System with Accessories and Cabling; Supply, Testing & Commissioning of 16 Channel CCTV Surveillance System ..
CHALIT SOUCHALAY
Precast Concrete Reinforced Bench (RDSO) (Q3)
PADDLE CYCLE, Outdoor Multi Gym, Horse Merry Go Round, ARM PADDLE BIKE
Polyethylene Pipes for Water Supply conforming to IS 4984 (Q3) (3 (3 ))
Mobile Containers For Solid Waste Conformingto IS12402 (Q3)
Steel Wheelbarrows (Q3)
Facility Management Services - LumpSum Based - WARD 03 NAGAR PARISHAD PIPRAI; Suppy and Installation of goods as per scope of work; Consumables to be provided by service provider (inclusive in contract cost)
Facility Management Services - LumpSum Based - WARD 10 NAGAR PARISHAD PIPRAI; Supply and Installation of goods as per scope of work; Consumables to be provided by service provider (inclusive in contract cost)
PVC Insulated Cable For Submersible Pumps ISI Marked To IS 694 (Q2) (3 (3 ))
PVC Insulated Cable For Submersible Pumps ISI Marked To IS 694 (Q2) (3 (3 ))
INTEGRATED SECURITY SURVEILLANCE SYSTEM SERVICE - SUPPLY AND INSTALLATION CCTV CAMERA AS PER REQUIRED DEMAND; SUPPLY AND INSTALLATION CCTV CAMERA AS PER REQUIRED DEMAND; SUPPLY AND INSTALLATION CCTV CAMERA AS PER REQUIRED DEMAND; SUPPLY AND INSTALLAT..
FLOOD LIGHT 30 W, FLOOD LIGHT 60 W, FLOOD LIGHT 90 W, FLOOD LIGHT 120 W, CABLE 10 SQ MM, CABLE 16 SQ MM, CABLE 25 SQ MM, POLE
Humic Acid (Q3)
Antispatterspray (Q3)
transformer 33/0.4KV 3 Phase
Eucalyptustreeseedorcutting (Q3)
PVC Insulated Cable For Submersible Pumps ISI Marked To IS 694 (Q2) (3 (3 ))
Manpower Outsourcing Services - Minimum wage - Unskilled; Not Required; Admin
Speed Breaker (V2) (Q3)
Toilet cleaner, Acid based Powder (V2) conforming to IS 13760 (Q4) (3 (3 ))
Alumino - Ferric (V2) Conforming to IS 299 (Q3) (3 (3 ))
LED Luminaire For Road And Street Lights Conforming To IS
Drinking Water Coolers (V4) ISIMarked To IS1475 (Q2)