Loading…
Loading…
811 results • Latest
Pole-Mounted Outdoor Dustbin (Q3)
Surface Coating & Protective Finishing Framework for Multi- Zonal Civic Infrastructure Systems
Unbranded Liquid form Bio Culture for waste water treatment 50, Unbranded Liquid form Bio Culture for waste water treatment 50 liter packed in Drum
Fabricated Special Purpose Vehicleon Truck/Van (Q3)
Steel Wheelbarrows (Q3)
Elevated Multi-Directional Luminous Support Structure with Dynamic Load Stability, Solid-State Electro-Optical Illumination Module with Regulated Driver Architecture
Thermal Aerosol Generation Fluid with Controlled Volatility and Dispersion Characteristics
Bio-Organic Nutrient Enrichment Compound with Controlled Release Characteristics
CCTV Camera
Facility Management Services - LumpSum Based - Nagar Parishad Katangi; FRP Urinal Cabin 6 Nos For Male and Female; Consumables to be provided by service provider (inclusive in contract cost)
Oxyfluorfen 23.5%EC (Q3)
Chlorpyrifos, Technical - IS 8963 (Q3)
Lighting Poleor Postand Hardware-Tubular Street Light Poles (V2) (Q3)
Outdoor/Indoor Fountain (Q3)
Single Axle Tractor Trailerasper IS8213 (Latest) (Q3)
Alumino - Ferric (V2) Conforming to IS 299 (Q3), Stable Bleaching Powder for Household and Industrial use (V3) conforming to IS 1065 (Part 1) (Q3) (3 (3 ))
Toilet cleaner, Acid based Powder (V2) conforming to IS 13760 (Q4), Toilet Cleaner Liquid (V3) conforming to IS 7983 (Q4) (3 (3 ))
de oxidise calcium hypochlorite
Pole-Mounted Outdoor Dustbin (Q3)
Pole Mounted Stainless Steel Dustbin (V2) (Q3)
LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II) (Q2)
LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II) (Q2)
LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II) (Q2)
LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II) (Q2)
Portable Toilet (Q3)
Toilet cleaner, Acid based Powder (V2) conforming to IS 13760 (Q4) (3 (3 ))
Customized AMC/CMC for Pre-owned Products - Supply of approved quality machine-crushed stone aggregates Gravel in Cubic Meter; Supply of approved quality machine-crushed stone aggregates Gravel in Cubic Meter; Comprehensive Maintenance Contract (CMC).., Customized AMC/CMC for Pre-owned Products - Supply of approved quality Fine Sand river sand screened sand in Cubic Meter; Supply of approved quality Fine Sand river sand screened sand in Cubic Meter; Comprehensive Maintenance Contract (CMC); Supply..
Tractor Operated Boom Sprayer (Q3)
Toilet Cleaners Powder as per IS 13760 (Q4), Toilet cleaner, Acid based Powder (V2) conforming to IS 13760 (Q4) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Speed Breaker (V2) (Q3)
Hiring of Earth Moving Equipments, Material Handling Equipments and Cranes (per Hour basis) - As Per Buyer's Requirement; Earth Moving Equipment; Tractor+Trailers, Tractor/Dozer with Scrap master, Tractor with Drilling Equipment, Tractor
Outdoor/Indoor Fountain (Q3)
Sanitary Napkins Vending Machines (Q3), Sanitary Napkins Incinerator Machine with Smoke Control Unit (Q3)
Steel Wheelbarrows (Q3)
Mobile Fluid Transport & Bulk Containment Unit with Integrated Dispersion Mechanism
GIS related Survey Services - Sq. Meter; Municipal Boundaries; 1:5000; Total station method; DWG
Trailer Mounted Suction Machine (Q3)
Toilet cleaner, Acid based Powder (V2) conforming to IS 13760 (Q4) (3 (3 ))
Primary Coagulant Agent
Decorative Lightning Pole (V2) (Q3) (3 (3 ))
Toilet cleaner, Acid based Powder (V2) conforming to IS 13760 (Q4) (3 (3 ))
Facility Management Services - LumpSum Based - Commercial; Painting Of Tabullar pole 175 nos Shifting work with installation include cable and other material; Consumables to be provided by service provider (inclusive in contract cost)
Toilet cleaner, Acid based Powder (V2) conforming to IS 13760 (Q4) (3 (3 ))
Toilet cleaner, Acid based Powder (V2) conforming to IS 13760 (Q4) (3 (3 ))
Power Control Center (PCC) Panelfor Power Distribution (Q3)
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - REPAIR, MAINTENANCE GRANITE AND SANITARY WORK SAMUDAIK BHAWAN WARD 15 AS REQURIED LIST; REPAIR, MAINTENANCE GRANITE AND SANITARY WORK SAMUDAIK BHAWAN WARD 15 AS REQURIED..
Safety Equipment Tool Kitfor Labours (Q3)
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - REPAIR, MAINTENANCE MS SQUARE HOLLOW PIPE, ANGLE AND SHEET SAMUDAIK BHAWAN WARD 15 AS REQURIED LIST; REPAIR, ANGLE AND SHEET SAMUDAIK ..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - REPAIR, MAINTENANCE ELECTRIC WORK SAMUDAIK BHAWAN WARD 15 AS REQURIED LIST; REPAIR, MAINTENAN..
Entrance standardised and customised Gateway as per