Loading…
Loading…
783 results • Latest
Relay Non AC immune plug in type style QN1 DC neutral Line ,24 Volt ,8F/8B ...
Annual Maintenance contract for 01 no. Track Relaying Train (TRT), model: P 811 S of HARSCO make for the year 2026-27 & 2027-28 on single tender basis with OEM i.e. M/s Harsco Track Machines And Services Private Limited-New Delhi.
Supply & application of composite high voltage insulated coating or insulating sheet under overline structures having less clearance with OHE in Sonpur division.
Set of Outer labyrinth (DE) for 3-ph Traction Motor Model no. 6FRA 6068 consisting of 02 items:- 1) Outer Labyrinth DE 5780/069, Qty 01 no./set 2) Outer Bearing Cap/DE 5780/056, qty. 01 no/set. (Hard Copy of 3-D CMM Report must be provided with each set.) Specn./ Drg No - As per CLW Drg. No.-4TWD.096.029 Alt-8 and 1TWD.096.006, Alt-8. Specn no. 4TMS.096.068, Rev-2, Alt-2, STR no. - RDSO/2007/EL/STR/0021 Rev-1
Set of Pins for brake rigging of WAP4 locos in each set Mn Steel to IRS-R-65 consisting of 06 items 84 nos. Specification :- As per annexure attached below
Set of bearing cover (CE) consisting of 1 No Inner bearing cover (CE) to Hitachi Drg No. 10Q 750 259 Alt-i Ref.2, and 01 No Outer bearing cover (CE) to Hitachi Drg No. 10Q 750 259 Alt-I Ref.1 and confirming to CLW Spec. 4TMS.095.003 Rev- l, Alt.3 and RDSO STR No RDSO/2007/EL/STR/0017, Rev-1 with latest.
Operation and maintenance including spare parts during repair of Inoculum Generation Plant, capacity of 100 cubic meter capacity at Carriage Repair Workshop, Harnaut for three years.
MDL PWR 68817CR1AA - Rectifier for Auxiliary Converter as per BHEL Part No. ED68817CR1AA
Metallised carbon strip for pantograph Specification :- RDSO Drg. No. SKEL-4303, Rev-6, RDSO Specn.no.- RDSO/2009/EL/SPEC/0097/Rev.'1' Sept.2013
Aux.Switch and lever assly. of EM contactor Specification :- CLW Drg. no.- 2TWD.291.053,3TWD.291.049,3TWD.291.057
Seat cushioning material size 51 x 550 x 1820 mm as per Drg. no. ICF/TCN-6-1- 819 alt-a/2, item-5 to RDSO spec. No. C-K607 (DTBPB) (Rev.2 of December -2015 with amendment -1 of August-2016)
Slack adjuster Bottom with Mn Steel Bush IRS-R-65 for WAG-7 loco Specification/Drg.:- CLW Drg no-06/3/19/99 Alt-1 Bush Material- Mn Steel to IRS- R-65
Set of LP Piston with GP consisting of : (a) Piston and G.P. dia 127 ELGI PT. No.- 000477780- 02 Nos./Set. Circlip ELGI Part No.- 000917230-04 Nos. per Set. (b)Piston and G.P dia 100 ELGI Pt. No.-000477770-01No./Set. Circlip ELGI Part No.- 000917220-02 Nos.per Set
Complete Speed Sensor Assembly without PGR for IGBT based Locos with 5 plus 3-Pin connector as per M/s Bombardier Transport Item No. 000010 and part No. TC3EYP401277R0001.
Motor for main compressor. Specn/Drg No. :- RDSO Spec No-E-10/3/09 (Motor) with Amendment No. 01 to 06 CLW spec No-CLW/ES/3/0100 Alt-E.
Inner bearing cover CE for TM type HS-1050 of WAG7 Loco. Specification :- Drg.no.- 10Q.750-259, Alt-I, ITEM-2
Manpower Outsourcing Services - Minimum wage - Skilled; Secondary School; Admin
S&T work including replacement of panel interlocking to Hot standby Electronic interlocking in connection with "Construction of Private Railway Siding for upcoming Cement Grinding Unit of M/s J K Cement Ltd., proposed with take -off from Raghunathpur Railway Station under Danapur Division.
Construction of substructure of Br. No. 382(1x61.0 M OWG) & 383(1x61.0 M OWG) for two lines and transportation, assembling and launching of superstructure of Br. No. 382(1x61.0 M OWG),383(1x61.0 M OWG) ,Br. No. 383(B)(1x61.0 M OWG) & 383(C) (1x61.0 M OWG), linking of track on bridges, Supply & fabrication of pathway materials, and other allied works in connection with doubling of VKNRPNYA section in Samastipur division of E.C. Railway.
SEE Division - Provision of associate S&T work in connection with provision of LHS in lieu of LC no. 1 (BCA-VPDA) , LC no. 2 (BCA-VPDA), LC no. 44 (CSR-AYRN) and provision of RUB in lieu of LC no. 7'B' (VPDA-BCA), 13'C'(MOG-VPDA) & LC no. 14'A'(MOG-VPDA).
Consultancy work for preparation of JFR, GAD, DPR, Land Plan & Soil investigation for construction of 27 ROBs in lieu of LCs under Gati Shakti Unit Sonpur Division.
ZPT Switch Specification/Drg.no. :- CLW Specn.no. No. CLW/ES/S-3 Alt.I with latest Alt.
Roller bearing NH-324 for traction motor HS1050/HS15250A for CE End
Work of CAMC for out of warranty coaches & periodical maintenance of under warranty coaches of pneumatic pressurized flushing system (PPFS) and Electro Pneumatic Pressurized Flushing System (EPPFS) installed in LHB Coaches at DHN Coaching Depot for the period of 3 years and Supply, laying of Epoxy flooring in LWACCW, LWACCN, LWACCNE, LWSCN, LWS/LS and LWSCZAC type LHB coaches at Coaching depot, DHN for 3 years.
JHD Yard remodeling: Provision of UP loop line No.- 1 and DN loop line No.- 4 to be converted as common loop along with back shunt signal in DN main line for all lines at JHD, along with extension of line No.-2 upto 50M towards PNBE end is urgently required at this station.
General Purpose Grease for M and P Application (RDSO Spec. No. WD-17-Misc- 92) of Balmerol MG LL 3 of Balmer Lorry/Servo grease RR 3 of IOCL/Lithian RR3 of HPCL
N-ACETYL CYSTEINE 150 MG AND TAURINE 500 MG ORAL TABLET
Supplying and stacking of 75,000 CUM of machine crushed track ballast 50mm size from recognized quarry conforming to RDSO's & specification for track ballast in stack measurement and loading the same into any type of Railway Wagon at Jhajha Ballast siding under Danapur Division.
SET OF BASE GASKETS AND INSTALLATION KIT FOR ELECTRIC CCB OF M/s. KBIL MAKE ELECTRIC CCB SYSTEM CONSISTING OF 6 ITEMS IN 6 NOS AS- 1) GASKET, 16 CP (PT NO.-775945)-QTY- 1 NO/SET, 2) GASKET, 20 CP (PT NO- 775945)-QTY- 1 NO/SET 3) GASKET, ER (SPECIAL),(PT NO-780623)-QTY- 1 NO/SET 4) GASKET, BP (PT NO- 780624)-QTY- 1 NO/SET 5) GASKET, BCCP (PT NO-775942)-QTY- 01 NO/SET 6)KIT, INSTALLATION OF HEADER BAR (PT NO- 788829)-QTY -01 NO/SET FOR 3-PHASE LOCOMOTIVE
Power Supply Module Assly Unit for Brake Electronics to M/s FTRTIPL Pt. No- 780350100
Construction of STP Plant as per required capacity (Approx 0.4 MLD), construction of drain and other ancillary work at Ara.
Supply, installation and commissioning of GPS base tracking devices with pre- installed SIM and annual maintenance after one year (i.e. complete one year of date of commissioning) of GPS base tracking devices and network services for the period of 03 years including loading, unloading, transportation and all taxes etc as per direction of Engineer in-charge or his authorized representative at site.
Reconditioning / Resurfacing of 52/60 kg crossing by Robotic reconditioning as approved by RDSO/LKO at various locations under section Sr.DEN/3/DNR.