Loading…
Loading…
413 live217 closing this weekmost from East Coast Railway and Indian Railways
413 results • Latest
Balance work for Safety fencing along the track for running of trains in Nergundi - Gurudijhatia section under the jurisdiction of ADEN-I/Cuttack of Khurda Road Division.
Major repair and Renovation of Officer's chambers and attached Offices at the DRM office complex in Sambalpur Division.
Custom Bid for Services - Comprehensive Maintainance of Generator sets of Electrical(G) department Similar Category Customized AMC/CMC for Pre-owned Products
Jeypore - Nabarangpur New BG Railway Line project: Design & Construction of New BG Railway Line between Ambaguda(excluding) (13.60 Km) to Nabarangpur(including) (43.996Km) involving Earthwork in Formation in Embankment/Cutting, Blanketing, Side Drains, Catch Water Drains, Minor Bridges, Major Bridges(excluding bridge no. 85 at km. 37.080 i.e. Indravati Bridge), Road Over Bridges (ROBs), Road Under Bridges (RUBs), Protection Works, P.Way Track Works with Contractor's own material supplies including supply of Track Ballast, new wide based PSC Sleepers, Special PSC Sleepers (for Turnouts, Improvised SEJs, Guard Rails etc), Points (Thick Web Switches) & WCMS Crossings, Glued Joints, H-Beam/Composite Sleepers over Girder Bridges, Improvised SEJs, all P-Way fittings, 2x25 KV AC OHE Works, 2x25 KV TSS with SP/SSP works along with SCADA, modification/Conversion to Underground for Overhead Electrical HT/LT Power Line Crossings, Electrical General Services, construction of Platforms, Station Buildings, Service Buildings, SP/SSP Buildings, TRD depot building with Tower Wagon shed, Residential Buildings, Water Supply, indoor and outdoor Electrification etc. on EPC Basis in RGDA Division of East Coast Railway"
Construction of P.Way track of 280 Mtr (Over RCC pit line) inside Workshop for stabling of coaches at Carriage Repair Workshop, Mancheswar.
Supply of Alumino Thermic Welding portion for 60Kg/60EI - R260 rails at various location under Jurisdiction of DEN/West of Sambalpur Division.
Monthly Basis Cab & Taxi Hiring Services - SUV; 2000 km x 320 hours; Outstation 24*7
Monthly Basis Cab & Taxi Hiring Services - MUV; 1500 km x 320 hours; Outstation 24*7
Monthly Basis Cab & Taxi Hiring Services - SUV; 2000 KM Per Month for performing official duties of Divl Mechanical Engineer Freight Sambalpur for a period of 03 years; Local 24*7
S&T portion of the work - "Provision of Intermediate Block Signalling between Lapanga - Rengali in JSG-SBP BG double line electrified section."
Provision of 5kVA Auxiliary Transformers(AT) in connection with Supply, Installation and Commissioning of Hot Axle Box Detector(HABD) on turnkey basis along with recording system with cloud server over KUR Division. Qty-08 Nos. including the work for electrical power supply through Auxiliary Transformer(AT) at all 08sites.
Jute conference folder with Tribal print and A4 size paper carrying capacity.
Execution of day-to-day maintenance & allied activities of MHSS (Mixed Higher Secondary School) campus and class rooms at KUR station for maintaining hygiene and favorable learning environment for a period of 02 years (730 days).
Carrying out of Non-core Activities associated with AC/TL coach maintenance at SBP Coaching Depot of Sambalpur division of East Coast Railway for a period of 02 years.
Mutation of Railway land duly converting the ownership details, survey of muted Railway land in the name of E. Co. Railway and supply of land boundary maps & RoR over Khurda Road Division.
Supply of Welding portions for 60 kg/60 EI-R260 Rails for A.T/SKV process (Single Shot crucible Technique) under the jurisdiction of Sr.Divisional Engineer/Central/Rayagada of Rayagada Division.
Supply and stacking of 50,000 Cum Machine crushed track ballast as per Railway's specification at Sikir Depot from outside Railway land/quarry and loading into Railway's Wagons under the jurisdiction of ADEN/Titlagarh of Sambalpur Division.
Design, Supply, Erection, Modification, Testing and Commissioning of 1x25kV OHE along with Augmentation of existing Sub-Sectioning & Paralleling Post (SSP) with associated PSI work for Construction of ROH Shed & CC Examination facility at Baghuapal in Khurda Division under East Coast Railway.
STERILE PAD WITH NONWOVEN ADHESIVE DRESS [STERILE PAD WITH NONWOVEN ADHESIVE
FORMALDEHYDE SOLUTION (37-41% W/V) HCHO, [FORMALDEHYDE SOLUTION
NON-ABSORBABLE STERILISED SURGICAL SUTUR [NON-ABSORBABLE STERILISED