Loading…
Loading…
424 live176 closing this weekmost from East Coast Railway and Indian Railways
424 results • Latest
COUGH DROP CONTAINING ATLEAST AMBROXOL [ COUGH DROP CONTAINING
Design and Construction of Multi storied, Type-II, Type-III, Type-IV and Type-V Staff Quarters, Divisional store depot, Training institute including electrical general works and allied works at Rayagada and Area office at Koraput in connection with setting up of Rayagada Division in East Coast Railway On Engineering, Procurement & Construction (EPC) Mode
Jeypore-Malkangiri New BG Railway Line: Design & Construction of New BG Railway line from Km 69.60 to Km 125.18 involving Earthwork in Formation , Embankment/Cutting, Blanketing, Side Drains, Catch Water Drains, Minor Bridges, Major Bridge, Road Under Bridge (RUBs), Road Over Bridge (ROB's), Protection Works, P.Way Track Works with Contractor's own materials(except New/SH Rails) construction of Platforms, Station Buildings, Service Buildings, SP/SSP buildings and Residential Buildings, Water Supply, indoor and outdoor electrification, Provision of 1x25 KV Conventional type OHE, Provision of 2 Nos. TSS, 1 No SP, Construction of new Sub-stations, Electrification of station building, Circulating areas, FOBs, PFs, Quarters, Goomties, Modification/Conversion to Underground for overhaed electrical HT/LT power line crossings etc. on EPC Basis in Rayagada Division of East Coast Railway.
Gunupur-Theruvali New BG line project : Design and Construction of New BG Railway line from Km 122.750 to Km 141.940 (Excluding RCC BOX, ROB Br. No 388 from km 137.725 to 137.925 but including P Way & OHE works) involving 08 Nos of Tunnels (T-2 to T-9) & from Km 110.02 to Km 113.12 involving 1 No Tunnel(T-1), BLT Works & its approaches and Earthwork in Formation in Embankment/Cutting, Blanketing, Side Drains, Catch Water Drains, Minor Bridges, Major Bridge, Road Over Bridge (ROBs), Road Under Bridge (RUBs), Protection Works, P.Way Track Works with Contractor's own material supplies including supply of Track Ballast, new wide based PSC Sleeper, Special PSC Sleepers (For Turnouts, Improvised SEJs, Guard Rails Etc), Point (Thick Web Switches & WCMS Crossing, Glued Joints, H- Beam/ Composite Sleepers over Girder Bridges, Improvised SEJs, all P-Way fittings, OHE foundations, Supply and Erection of OHE Masts, Provision of 1X25 kV Conventional Type OHE (OHE-22.660TKM) including 2.86 Km ROCS in Tunnel, Provision of one feeding post (TSS) Modifications/Conversion to Underground for overhead electrical HT/LT Power Line Crossings, construction of Platforms, Station Buildings, FOB, Service Buildings, SP/SSP buildings and Residential Buildings, Water Supply, indoor and outdoor Electrification works etc in Waltair Division of East Coast Railway.
Jeypore-Malkangiri New BG Railway Line: Design & Construction of New BG Railway line from KM 41.50 to Km 69.60 (including Nunkhari Station) involving Earthwork in formation, Embankment/Cutting, Blanketing, Side Drains, Catch Water Drains, Minor Bridges, Major Bridge, Road Under Bridge (RUBs), Viaducts, Tunnels, Protection works, BLT works, P.Way Track works with Contractor's own materials (except New/SH Rails), construction of Platforms, Station Buildings, Service Buildings, SP/SSP buildings and Residential Buildings, Water Supply, indoor and outdoor Electrification, Provision of 1X25 kV Conventional Type OHE, Tunnel OHE with ROCS, Tunnel lighting, TSS, SP, General Power Supply Arrangements Modifications/Conversion to Underground for Overhead electrical HT/LT Power line Crossings etc on EPC Basis in Waltair Division of East Coast Railway.