Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
477 live201 closing this weekmost from East Coast Railway and Indian Railways
477 results • Latest
Desktop Simulator
Capacitor Tripping Device for use in 25KV single pole Vacuum circuit breaker suitable for ALIND make. Model VSE 5/20 confirming to RDSO spen. NO. TI/SPC/LVCBIN/0120 (Dec 2013) .
BRAKING EXCITATION TRANSFORMER 60 KVA (ATFEX),NATURAL COOLING, 50 HZ AS PER CLW SPECIFICATION NO. CLW/ES/T-20 ALT-H OR LATEST.
AUTOMATIC CHANGEOVER CONTROL PANEL 60 A CLS PANEL CONFORMING TO RDSO SPECIFICATION NO. ETI/SPC/PSI/CLS/0020(12/02) (WITH A7C SLIP NO 1 TO 4 OR LATEST). PREFERRED MAKE : SYSTEMS AND SERVICES POWER CONTROLS, SUNTRON SYSTEMS AND Other RDSO's approved makes AS PER RDSO Item ID: 3100648.
Art Work at 09 ABSS Stations CAP, BALU, KUR (2nd entry), LGTR, RCTC, ANGL, TLHD, MRDL, PRDP in Khurda Road Division.
TWO YEAR RATE CONTRACT OF TURNOUT PSC SLEEPER, DRG: (RDSO) RDSO/T-9841 & DRG: (RDSO) RDSO/T-9790.
XLPE Cable for Working Voltage up to and Including 1.1 KV Marked To IS 7098 (Part 1) (Q2)
Jeypore - Nabarangpur New BG Railway Line project: Design & Construction of New BG Railway Line between Ambaguda(excluding) (13.60 Km) to Nabarangpur(including) (43.996Km) involving Earthwork in Formation in Embankment/Cutting, Blanketing, Side Drains, Catch Water Drains, Minor Bridges, Major Bridges(excluding bridge no. 85 at km. 37.080 i.e. Indravati Bridge), Road Over Bridges (ROBs), Road Under Bridges (RUBs), Protection Works, P.Way Track Works with Contractor's own material supplies including supply of Track Ballast, new wide based PSC Sleepers, Special PSC Sleepers (for Turnouts, Improvised SEJs, Guard Rails etc), Points (Thick Web Switches) & WCMS Crossings, Glued Joints, H-Beam/Composite Sleepers over Girder Bridges, Improvised SEJs, all P-Way fittings, 2x25 KV AC OHE Works, 2x25 KV TSS with SP/SSP works along with SCADA, modification/Conversion to Underground for Overhead Electrical HT/LT Power Line Crossings, Electrical General Services, construction of Platforms, Station Buildings, Service Buildings, SP/SSP Buildings, TRD depot building with Tower Wagon shed, Residential Buildings, Water Supply, indoor and outdoor Electrification etc. on EPC Basis in RGDA Division of East Coast Railway"
Request for Proposal (RFP) for providing Project General Management Services for New line, Doubling, Multitracking and other Projects in Construction Organization under CAO/Con of East Coast Railway for different field offices/ HQ office and ongoing projects under CAO/Con/BBS
Jeypore-Malkangiri New BG Railway Line: Design & Construction of New BG Railway line from Km 69.60 to Km 125.18 involving Earthwork in Formation , Embankment/Cutting, Blanketing, Side Drains, Catch Water Drains, Minor Bridges, Major Bridge, Road Under Bridge (RUBs), Road Over Bridge (ROB's), Protection Works, P.Way Track Works with Contractor's own materials(except New/SH Rails) construction of Platforms, Station Buildings, Service Buildings, SP/SSP buildings and Residential Buildings, Water Supply, indoor and outdoor electrification, Provision of 1x25 KV Conventional type OHE, Provision of 2 Nos. TSS, 1 No SP, Construction of new Sub-stations, Electrification of station building, Circulating areas, FOBs, PFs, Quarters, Goomties, Modification/Conversion to Underground for overhaed electrical HT/LT power line crossings etc. on EPC Basis in Rayagada Division of East Coast Railway.