Loading…
Loading…
791 results • Recent activity
Reparing and painting the slope at Kachuberia surface jetty at Mouza-Kachuberia under Sagar irrigation Sub-Division.in connection with Ganga Sagar Mela 2026.
Security Personnel for Guarding Scavenging Sweeping Cleaning and Pump Operating of UTSADHARA Project area at Barrackpore in the District of North 24 pgs. during the year 2025-26
Supply fitting and fixing of UTSHDHARA backlit nameplate install the letter with MS hollow tube, complete in all respect to the satisfaction of engineering in charge Development of Project Utsadhara 25 26 Gandhighat Barrackpore under Barrackpur Divn
Restoration of Rd with Hard shouldering related to proposed cutting open trench of Shanpukur to Dariyapur Rd from 0.103 km to 1.883 km Right Hand Side and from 0.012 km to 0.95km Left Hand Side having total length of 2718.00 mtr. for laying of .. PHE
Temporary restoration due to flood/excessive rainfall in different stretches from 6.50 kmp to 9.50kmp and 10.00 kmp to 11.00 kmp at Barrackpore Barasat Road under Barrackpur Division of North 24-Paraganas during the year of 2025-2026
Design Engineering Supply Installation Testing and commissioning of 14 KLD underground Smart Grey W T P with zero liquid discharge technology for Development of Project Utsadhara to Develop the River Bank of Gandhighat under BKP Divn during 2025 26