Loading…
Loading…
791 results • Recent activity
Preparation of concept design and presentation of theme for Exhibition rooms of Interpretation center consisting of proposal for Mural work Diorama Wall Mounting Ceiling Installation Direction Board etc in connection with UTSADHARA Project
Supply, fitting and fixing in position of FRP cladding on the structure of different installation within UTSADHARA project site under Barrackpore Division PWD during the year 2025 26
Emergent restoration of 01 (one) number ghoge formed during Purnima Kotal from 05.11.2025 to 08.11.2025 near 3 no. Charabidya at mouza Charabidya facing right bank of river Baniboyaliya in Block- Basanti, P.S.- Basanti, Dist - South 24 PGS under JID
Emergent Restoration of Sundarban Embankment damaged due to Purnima Kotal from 04.11.25 to 09.11.25 in between 18.500 km to 18.650 km at mouza Birajnagar facing Left bank of river Bidya in Block-Gosaba, P.S.-Gosaba, Dist-South 24 Pgs under JID
Emergent Restoration of Sundarban Embankment damaged due to Purnima Kotal from 04.11.25 to 09.11.25 in between 3.800 km to 3.860 km at mouza Kumirmari facing L/B of R/Puinjali in Block-Gosaba, P.S.-Sundarban Coastal, Dist-South 24 Pgs Under JID
Emergent Restoration of Sundarban Embankment damaged due to Purnima Kotal from 04.11.25 to 09.11.25 in between 0.900 km to 0.940 km at mouza Birajnagar facing Right bank of river Durgadwani in Block-Gosaba, P.S.-Gosaba, Dist-South 24 Pgs under JID