Construction of a Children Park at Mahul Bagan Colony Under ROCP.
Providing and Laying Pipe line at Gopalpura colony under Mugma Area.
Construction of 04 nos. Shed at Nirsa OCP under Lakhimata Group of Mines.
Construction of Badminton Court at RH colony under Mugma Area.
Construction of Platform of Kutcha portion at Area Store under Mugma Area.
Construction of PCC road from Office to Pusai river bridge at Nirsa OCP under Lakhimata Group of Mines.
Construction of boom barrier of Chapapur Colliery under Mugma Area.
Engagement of water tanker for supply of water for drinking purpose at Lalmatia colony rehab site (sabir grp) for the period of 365 days under Rajmahal Area.
Construction of Chadan Chabutra near pokhar of Lohandia rehab site under Rajmahal Area.
Supplying and installation of Solar power based mini water supply scheme for 02 units with bore well at high steel str. For mounting water storag tank having capacity 5000 ltr. At Kaddutola (Basdiha part) rehab site under Rajmahal Area
Deepening and extension of existing pond near Baithal Mission School at Urjanagar colony under Rajmahal Area under Amrit Sarovar Scheme.
Providing and fixing paver block at Basic school premises at Bara Simra rehab site under Rajmahal Area.
Drilling and commissioning of 01 nos. bore well all complete fitting with pump house at Simra rehab site under Rajmahal Area.
Supplying water from Bore Hole to Faridpur Village at Charanpur OCP under Satgram Sripur Area
complete rewinding and repairing of 100KVA 11KV 440Volt Lighting transformer feeding power to G.P. Camp, (B) 100KVA 11KV 440Volt transformer feeding power to Muslim Para, (C) 100KVA 11KV 440Volt transformer feeding power to BudBud Mahalla with instal
(1) Complete repairing and rewinding of 2nos 100KVA 550V 440V Lighting transformer with installation at upper dhowra and rewinding and repairing of 500KVA 11KV 550Volt Power transformer installed at 11KV pankha dhowra of Bankola Colliery.
(1) Repairing and Overhauling of Reyrlole England make 11 KV 400 Amps OCB CTR 100 5 (Sl.No.1) (B) Repairing and overhauling of 11KV Reyrole England make 400 Amps OCB (Sl.No.S 2) CTR 100 200 5 5 (C) Installation, testing and commissioning of 500 KVA
3 Nos Pump foundation R VIIA seam and R VII seam at Mill Incline and 3 and 4Pit unit under Shankarpur Colliery
Cleaning of drain and cleaning jungle at Mill Incline, 3 and 4 Pit and 6 No pit (Fan House) under Shankarpur Colliery.(Monsoon Preparation)
Providing of Quarry boulder fencing for protection of unauthorized entry near Quarry 2A(Part C) OC Patch and Bhatmura site under S B project
Construction of 6 nos. Isolation Sectionalisation stopping s around the proposed stowing panel 14 in RVII seam of No.2 incline of Bankola Colliery.
Drilling of 4 nos of NX size 63.00m each (non coring) upward inclined boreholes from RVIII(Top) seam to overlying caved and goaved workings of RIX seam at NKJ unit of Khandra Colliery
Drilling of 15 Nos underground non coring upward B.H 3 Nos from RVIIB to RVII seam 2 Nos from RVIIC to RVIIB seam 9 Nos from RVIIB to RVIIA seam and 1 No from RVI to RVIIC seam) at CM project of Nakrakonda Kumardihi B Colliery.
Debris cleaning along proposed Low Height Continuous Miners travelling route in R VIIA seam at Shyamsundarpur colliery
Erection of (02) Two nos. of Air Crossing in R VIIA Seam Shyamsundarpur Colliery.
Leasing of Electric Vehicles (Long Term) - Wet Lease; TATA Tigor EV, Tata Nexon EV, Mahindra XUV 400 EL Pro, Curvv.EV, MARUTI SUZUKI E VITARA; 2400 Kms Per Month & 24 Hours Per Day; 48 Months Lease; White
Maintenance of electrical infrastructures of Kajora Area and hospital colony under Kajora Area
Fabrication of fire bar of Lancashire boiler of Central Kajora Colliery
Dismantling transporting and lifting of Eimco make SDL 1754 1755 and 1767 from A and B pit to surface of Porascole East Colliery
Supply and installation of high mast tower at 6 no. pit of Porascole West Colliery
Replacement of 03 nos head gear pulleys of A pit and B pit with the help of hired crane of 100inch head gear pulleys at Porascole East Colliery
Strengthening of head gear structure of Jambad Colliery
Diversion of HT powerline to supply water and light for Jambad Porascole OCP
Repairing of winding engine of pit no. 2 of Central Kajora Colliery
Heightening of boundary wall in back side of 31 no. incline at Badjna Colliery under Mugma Area.
Construction of shed and platform for transformer at Lakhimata colliery under Lakhimata group of mines.
Upgradation of EQ-D type block 01 unit Quarter no-01 , EQ-C type block 01 unit Quarter no. 05 at LKC under Kenda Area
Construction of RCC box culvert at coal transporting road Shyampur-B Colliery under Lakhimata Group of Mines.
Construction of security Guard room at Kapasara Colliery under Mugma Area.
Providing Paver block in front of B type block at RH colony under Mugma Area.
Construction of Embankment along the old garland drain at E/S incline under lakhimata Group of Mines.
Providing and laying pipe line from coal depot to face at Barmuri OCP for water sprinkling at Haul Road.
Construction of Boundary wall at entrance of Haulage room at E.S. Incline under Lakhimata Group of Mines.
Cleaning of weigh bridge platform, cleaning kaccha drain, road repair and other miscellaneous work at Nirsa OCP under LMG as and when required basis.
Repairing of three nos. quarter qtr. no. are NHS/21/124, NHS/19/109 and NHS/46/378 at Hariajam Colony under Hariajam Colliery.
Repairing and painting shiv Mandir at Gopalpura colony under Mugma Area.
Repairing of block no NHS (D/S) 19/01, 02, 07, 08, 20/04, 07 and 21/.01 in Adarsh Colony under Chapaur Colliery.
Repairing of NHS(S/S) Block 19 qtr no.19/194,195 at Khoodia 3 no. colony under LMG.
Repairing of drain at back side of Block no. NHS-54 and 55 at Hariajam Colliery, Mugma Area.
Repairing of qtr. No. 15/140 at Lakhimata Colony 26/247 at Shanti Colony and 17/170 at Khoodia 3 no. colony under Lakhimata Colliery