Loading…
Loading…
3,787 results • Latest
Construction of 06 (SIX) no. of Ventilation Stoppings at 5 no. pit (Laskarbandh unit) Madhaipur Colliery, Pandaveswar Area
Heightening of washing platform (2No) for CAT 190 dumper section at main workshop under ROCP.
Monthly Basis Cab and Taxi Hiring Service - Without Fuel - SUV; Mahindra Bolero; 2026; 0; A/C; 24
Steel Wire Rope Sling 06mm x 3m, Steel Wire Rope Sling 08mm x 3m, Steel Wire Rope Sling 10mm x 3m, Steel Wire Rope Sling 13mm x 3m, Steel Wire Rope Sling 18mm x 6m, Steel Wire Rope Sling 32mm x 5m, D Shackle 10Ton, U Clamp Complete 60mm.
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Coal Mines; Extension of 11KV overhead lines from Kaddu Tola proposed rehab sites to Dumaria proposed rehab sites for installation of 100KVA 11KV/440V lighting transform..
SUPPLY, INSTALLATION AND COMMISSIONING OF WEIGHTOMETER