Loading…
Loading…
3,759 results • Latest
construction of 08 nos isolation stopping for proposed stowing panel no JB 7 of RVIII (Bottom) seam in NKJ unit of Khandra Colliery.
BOLT, CPLNG, 25MM, 96MM, W by NUT RBR BUSH, ANGL GRINDER, 1200W, 230V, 100MM, 10000RPM, WRENCH SET, CMBNTN, 5 by 16 TO 1-1 by 8IN, 8NOS, MULTIMETER, AC by DC, DGTL, 0-10A, 0-600V, FLASHLIGHT, DRAGON, SRCH TRCH, 10W, BRKR CRCT, MCCB, 20 by 25 by 32A, 240V, 1P
Repairing of Bell Bar(Yoke) nomenclature B39 applicable for EKG 10 Rope shovel.
Maintenance of 440V Overhead line at no. 1 pit, Emergency breakdown maintenance of 550V Overhead line and Breakdown maintenance of power line in respect of cable jointing, laying etc. at Madhaipur Colliery
OTR Tyres (V2) (Q3) ( ( 3 3 )) OEM Average Turnover (Last 3 Years) 1 Lakh (s)
Rewinding and Repairing of 50KVA,550V/440V Lighting Transformer, repairing of 30KVA, 3.3KV/440V Lighting Transformer, Rewinding and Repairing of 150HP,1440RPM, 550V Induction Motor Of Manderboni Colliery