Loading…
Loading…
128 results • Recent activity
Repairing/Rewinding of 150KW/550V 1480 RPM CC.NO. 169 GEC Make and one 110KW/550V 1480 RPM Marathon Make under Jhanjra Area
Installation and other associated works for Newly procured Powerware make 10 MVA, 33/6.6 kV Oil cooled Transformer Sl no. 25010050 at main substation MIC, JPC
Installation Extension of 3 inch dia. spray pipeline with manifold for development of CM panel 7A in R-V Seam by SHCM-3 at MIC Incline, JPC
Fabrication, Transportation, Installation, Commissioning and Trial run including necessary fabrication jobs of tail end trolley unit of 0 dip Belt Conveyor of MIC, Jhanjra Project Colliery
Dismantling Transportation Installation Commissioning Necessary Fabrication Trial run including Civil work of one 1200 mm width 1 75KW 550V PVC Belt Conveyor 8L Link Belt for a length of 180m from 8L 3D to 8L 4D CM Panel 10 in RV Seam of MIC Jhanjra
Transportation, Changing and Salvaging of Twenty Reels i.e. 4000 Meters 200 Meter Each Reel 1200 mm, Type 6, PVC Conveyor Belting in Various Locations of MIC, Jhanjra Project Colliery