Loading
Loading…
Loading…
3 results • Latest
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - CAMC of Tie lines P1 P2 Z1 and Z2 including quarterly inspection preventive and breakdown maintenance of 46 spans 33 kv OH line and tower infrastructure; CAMC of 46 span..
Flat Cable, Aluminium Conductor with PVC Insulation and Sheathed ISI Marked To IS 694 (Q2) (3 (3 ))
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - cable jonting work including excavation and refilling of earth along with supply of materials of the XLPEs UG and Aerial bunched cables for rectification of faults under..