Loading…
Loading…
816 results • Latest
Operation And Maintenance Of Water Supply Systems - AS PER ATC
Electric Ceiling Fan (V4) ISIMarkedto IS374 (Q2) (PACOnly)
Terminal Endsfor Aluminium Conductorsof Insulated Cables (Compression Cable Lugs) Conforming To IS8309 (Q3)
Terminal Endsfor Aluminium Conductorsof Insulated Cables (Compression Cable Lugs) Conforming To IS8309 (Q3)
Platform Step Ladder (V2) (Q3) (PACOnly)
FLUKE Hand Held 100 KHz Digital Multimeter
Junction Box for Lighting (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2025/B/7000161 Dated : 10-01-2026 Bid Document 1/13, -- Number of days for which Bid would be auto -- extended 10 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Primary product category Junction Box for Lighting Time allowed for Technical Clarifications during technical evaluation 4 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Item wise evaluation Arbitration Clause Yes ( Arbitration clause document ) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 Arbitration should not be routinely included in contracts Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
PEM, AEM and Alkaline Electrolyzer Test Station for 5 kW & 50 kW
Glue Stick (V3) (Q4)
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - THERMAL POWER PLANT; Removal/Replacement/Erection of Metallic Expansion bellows of APH; Service Provider
Bunk House (Q3)
Spiral Wound Metallic Gasket (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
High End Laptop-Notebook (Q2)
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - WT 5166G Work contract for maintenance of ash handling plant unit No 6 at Ukai TPS GSECL AHP-6; As per Schedule B and scope of work mentioned in ATC; As per ATC
Lunch Box (V3) (Q3) (3 (3 ))
Terminal Ends for Aluminium Conductors of Insulated Cables (Compression Cable Lugs) Conforming To IS 8309 (Q3)
Fire Fighting Suit (Set) (Q2)
Software Support Services 2.0 - Microsoft; Application Software; Implementation Services, Maintenance Services, Proactive Monitoring Services; Software Enhancements, Real-time support, Technical Modifications, Helpdesk Assistance; General Service Pro..
Supply, Installation, Testing & Commissioning of IoT Devices IoT Data Logger/RTU for CEMS/EQMS D
Flower Pots or Planters (V2) (Q3) (3 (3 ))
Paper Adhesives, Liquid Gum and Office Paste Type (V2) Conforming to IS 2257 (Q3)
Hiring Of Agency For ISO Certification Service - ISO 9001 - Quality Management System (QMS), ISO 14001 - Environmental Management System (EMS), ISO 45001 - Occupational Health & Safety Management System (OHAS); ISO Audit for WTPS (Schedule A) as per .., ISO 45001 - Occupational Health & Safety Management System (OHAS); ISO Audit for GTPS (Schedule B) as per .., ISO 45001 - Occupational Health & Safety Management System (OHAS); ISO Audit for UTPS (Schedule C) as per .., ISO 45001 - Occupational Health & Safety Management System (OHAS); ISO Audit for DTPS (Schedule D) as per .., ISO 45001 - Occupational Health & Safety Management System (OHAS); ISO Audit for STPS (Schedule E) as per .., ISO 45001 - Occupational Health & Safety Management System (OHAS); ISO Audit for UGBPS (Schedule F) as per.., ISO 45001 - Occupational Health & Safety Management System (OHAS); ISO Audit for KLTPS (Schedule G) as per.., Hiring Of Agency For ISO Certification Service - ISO 45001 - Occupational Health & Safety Management System (OHAS); ISO Audit for BLTPS (Schedule H) as per Schedule-B-II; As Per ATC, Hiring Of Agency For ISO Certification Service - ISO 45001 - Occupational Health & Safety Management System (OHAS); ISO Audit for KHEP (Schedule I) as per Schedule-B- II; As Per ATC, Hiring Of Agency For ISO Certification Service - ISO 45001 - Occupational Health & Safety Management System (OHAS); ISO Audit for UHEP (Schedule J) as per Schedule-B-II; As Per ATC, Hiring Of Agency For ISO Certification Service - ISO 9001 - Quality Management System (QMS); ISO Audit for CO (Schedule K) as per Schedule-B-III; As Per ATC
Hiring of Sanitation Service - Manpower Based Model - Sweeper; 6; All Areas; All Areas; Daily; 1, Hiring of Sanitation Service - Manpower Based Model - Sanitation Officer; 6; All Areas; All Areas; Daily; 1
Hiring of Sanitation Service - Manpower Based Model - Sweeper; 6; All Areas; All Areas; Daily; 1, Hiring of Sanitation Service - Manpower Based Model - Sanitation Officer; 6; All Areas; All Areas; Daily; 1
File/Folder (V3) (Q4)
Pads for Rubber Stamps (V2) Conforming to IS 4747 (Q4)
Register (V2) (Q4)
Staplers(V3) (Q4)
Stationary Valve Regulated Lead Acid Batteries (V3) Conforming To IS15549 (Q3)
2Cx2.5sqmm Armoured LT PVC Cable
Portable Fire Extinguishers (V3) ISIMarkedto IS15683 (Q2)
Refrigerant Gas (Q3)
Terminal Endsfor Aluminium Conductorsof Insulated Cables (Compression Cable Lugs) Conforming To IS8309 (Q3)
Terminal Endsfor Aluminium Conductorsof Insulated Cables (Compression Cable Lugs) Conforming To IS8309 (Q3)
Hiring of Agency for IT Projects- Milestone basis
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - WT 5159G Work of full length replacement of apron feeder chain with pan and its related auxiliaries for 500 MW coal handling plant at Ukai TPS CHP-3; As per Schedule B a..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - THERMAL POWER PLANT; Electrical rewiring work of old service building offices and various maintenance tool rooms in premises of GSECL GTPS plant lighting on as and when ..
Plain Copier Paper (V3) ISIMarkedto IS14490 (Q4)
Manpower Outsourcing Services - Minimum wage - Skilled; High School; Others, Manpower Outsourcing Services - Minimum wage - Unskilled; Secondary School; Others
Safety Footwear (V3) ISI marked to IS 15298 (Part 2) (Q2) ( ( 3 3 ))
Business Intelligenceand Data Analysis Software (V2) (Q2)
Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2) ( ( 3 3 ))
Tubular Hacksaw Frame (Q3)
Annual Maintenance Service - Desktops, Laptops and Peripherals - AS PER ATC; AS PER ATC
Xlpe Cables, Category C2 - FR - LSH, for Working Voltages From 3.3 KV up to and Including 33 KV as per IS 7098 (Part 2) (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2025/B/7011910 Dated : 13-01-2026 Bid Document 1/8, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 3 Bid to RA enabled No Type of Bid Two Packet Bid Primary product category Xlpe Cables, Category C2 - FR - LSH, for Working Voltages From 3.3 KV up to and Including 33 KV as per IS 7098 (Part 2) Time allowed for Technical Clarifications during technical evaluation 4 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Item wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India Schedule 1 EMD Amount (In INR) 33746 Schedule 2 EMD Amount (In INR) 31500 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 3.00 ( ) Duration of ePBG required (Months). 19 2/8 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b). The EMD Amount will be applicable for each schedule/group selected during Bid creation. (c)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : CE(O&M) GSECL, SSHEP, 6th Floor, Administrative Building, Kevadia Colony-393151, Narmada. (A.n.patel) UIN Number NCTGC2415P
Plain Copier Paper (V3) ISIMarkedto IS14490 (Q4)
Operation and Maintenance Of Electrical Systems/Electrical Installations - Work of Maintenance and replacement of lighting fixtures street light points etc at TPS Gandhinagar
Pointer Fixer for Pressure Gauges, Pointer puller for Pressure Gauges, Dial type indicating Pressure Gauges
Hiring of Safety Consultant
BHEL GTPS AND STPS