Loading…
Loading…
794 results • Latest
Collecting Electrode with locking plate, Collective Electrode with C Clamp
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - THERMAL POWER PLANT; Work of cleaning lifting shifting and replacement of LT Motors Turbine and Generator side electrical equipment during day to day routine preventive..
Customised Ambulance with Equipment (Q2) (3 (3 ))
M - Seal as per IS 9197 (Q3)
Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Submersible Pumps for Slurry Application (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Coffee Dispensing Machine (V2) (Q3)
Terminal Endsfor Aluminium Conductorsof Insulated Cables (Compression Cable Lugs) Conforming To IS8309 (Q3)
Manpower Outsourcing Services - Minimum wage - Unskilled; Not Required; Others
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - BHAVNAGAR LIGNITE THERMAL POWER STATION; Work of Erection and Commissioning of Vortex Finder in Boiler at BLTPS, GSECL; As per ATC
COMMON PROOFED CANVAS/DUCK AND PAULINS (
FBHE AND ASH COOLER SPICE VALVE ACTUATOR WITH EPAC COMMISSION NO - 3152212001, MODEL NO. SAR12B45, M
Terminal Ends for Aluminium Conductors of Insulated Cables (Compression Cable Lugs) Conforming To IS 8309 (Q3)
Terminal Ends for Aluminium Conductors of Insulated Cables (Compression Cable Lugs) Conforming To IS 8309 (Q3)
Calibration Services - Electrical; Voltage, Current, Power (AC/DC), Frequency, Power Factor, Phase Angle, Resistance, Temperature; NABL Labs; Hybrid (detailed in scope of work)
Entry and Mid Level Desktop Computer (Q2) (3 (3 ))
Interactive Panels with CPU (Q2) (3 (3 ))
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - WT 5105G Work of Various Routine Preventive and Breakdown maintenance of Feeder Breakers of CHP I at TPS UKAI on as and when required basis (CHP 1); Various Routine Prev..
HT Tape (Q3)
Plain Copier Paper (V3) ISIMarkedto IS14490 (Q4) (PACOnly)
Rechargeable LED Head Torch (Head Lamp) (Q3)
File/Folder (V3) (Q4), Register (V2) (Q4), Tags For Files (V3) Conforming to IS 8499 (Q4) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Operation and Maintenance Power House/Power Plant - As Per ATC
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - WT-5137G - Work of Complete Overhauling (Mechanical & Electrical work) for 10 tones capacity EOT crane installed at CW Pump House for Units 3, 4 & 5 at Ukai TPS - TMD-II..
Insulatedpliers (Q3)
Computer Printer (V2) (Q2)
Custom Bid for Services - Design, Development, and Integration of Biometric Attendance System with EUrja ERP of Gujarat State Electricity Corporation Limited (GSECL) all power stations Similar Category Software Support Services 2.0
Multifunction Printer (Print, Scan, Copy) (Q2) (3 (3 ))
Electrical Rescue Rod (Q3), Respiratory Filter - Full Face Masks (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller OEM Authorization Certificate, Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled No Type of Bid Two Packet Bid Primary product category Electrical Rescue Rod Bid Number : GEM/2025/B/6263044 Dated : 14-06-2025 Bid Document 1/7 Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 183591 Evaluation Method Item wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank Bank Of Baroda (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 13 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : CHIEF ENGINEER Gandhinagar Thermal Power Station, Gujarat State Electricity Corporation Limited, Gandhinagar-382041, Gujarat (Chief Engineer) Splitting
Project Management Consultancy (PMC) Service - Supervision Consultancy (SC); Normal Highway Projects; Technical Audit and Quality Assurance as Authority Engineer for Construction of various Civil Infrastructures for 500 MW Harsad Solar Park Dist Bana..
Pliers, Pincers and Nippers as per IS 2615, IS 11526 (Q3) ( PAC Only ) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Pliers, Pincers and Nippers as per IS 2615, IS 11526 (Q3) ( PAC Only ) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Vehicle Hiring Service - Per Vehicle-Day basis - SUV/MUV; As Per ATC; Local; Plain; As Per ATC; Round Trip
M - Seal as per IS 9197 (Q3)
SAMSUNG In Plane Switching (IPS) Computer Monitor with a Power, SAMSUNG In Plane Switching (IPS) Computer Monitor with a Power Cable and/or Adapter
Dialtypeindicating Pressure Gauges (Q3)
Staple Pins/Staples(V3) (Q4), Paper Pins (V2) Conforming to IS 5653 (Q4), Staplers(V3) (Q4), Paper Punch Machine(V2) (Q4), Tags For Files (V3) Conforming to IS 8499 (Q4), Pads for Rubber Stamps (V2) Conforming to IS 4747 (Q4), Stamp- Pad Ink (V2) Conforming to IS 393 (Q4) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
(Compression Cable Lugs) Conforming To IS8309 (Q3) (PACOnly)
Custom Bid for Services - Work of capacity enhancement at Coal Handling plant Stage-II of Ukai TPS on EPC basis Similar Category Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2)
File/Folder (V3) (Q4)
Television (V3) (Q2)
Rain Suit (Q3)
Item1, Item2, Item3, Item4, Item5, Item6, Item7, Item8, Item9, Item10, Item11, Item12, Item13, Item14, Item15, Item16, Item17, Item18, Item19, Item20
Multi Gas Detector (V1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Lunch Box (V3) (Q3)
Plain Copier Paper (V3) ISIMarkedto IS14490 (Q4)
Plain Copier Paper (V3) ISIMarkedto IS14490 (Q4)
File/Folder (V3) (Q4) ( PAC Only )
ORIFICE SIZE 426 FOR PF PIPE DIA 558, ORIFICE SIZE 437 FOR PF PIPE DIA 558, ORIFICE SIZE 442 FOR PF PIPE DIA 558, ORIFICE SIZE 448 FOR PF PIPE DIA 558, ORIFICE SIZE 453 FOR PF PIPE DIA 558, ORIFICE SIZE 458 FOR PF PIPE DIA 558, ORIFICE SIZE 463 FOR PF PIPE DIA 558
Manpower Outsourcing Services - Minimum wage - Unskilled; Not Required; Others, Manpower Outsourcing Services - Minimum wage - Skilled; Not Required; Others