INSTRUMENTATION LIMITED MAKE CONTROL VALVE SPARES
MENDO NON TAR PLASTIC WATER PROOFING COMPOUND, TAR PLASTIC, NEVER LEAK LIQUID ROOF COATING 20 LTR/DRUM, Perfect roof coat
Carbon Papers (V2) (Q4) (PACOnly)
Currency Counting Machine (V2) (Q2)
LPP 2652 spares for Forbes Marshall make SOx NOx
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - PW99G Work of complete repair and calibration of MEGGER make MGFL100 DC Battery Ground Fault Tracer Kit along with its accessories, having bearing Sr No 052705560424 of ..
VELJAN MAKE COMPLETE DIRECTION CONTROL SOLENOID VALVE MODEL NO: 4D02 3 208 03 02 B1 G0Q 51, REPAIRING KIT/SEAL KIT FOR VELJAN MAKE DIRECTION CONTROL SOLENOID VALVE, 24 V DC COIL FOR VELJAN MAKE DIRECTION CONTROL SOLENOID VALVE MODEL NO: 4D02 3 208 03 02 B1 G0Q 51
Carbon Papers (V2) (Q4)
Carbon Papers (V2) (Q4)
SUPPLY OF INSPECTION AND SIGHT GLASS AT GTPS
Cation Exchange Resin-IS:7330 (Q3), Anion Exchange Resin-IS:7330 (Q3) (3 (3 ))
File/Folder (V3) (Q4)
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - WT-5143G - Work of overhauling/in-situ repairing of HP-LP bypass valves, its associated spray valves and Hydraulic Actuators installed in HP-LP bypass system during R&M ..
Monthly Basis Cab & Taxi Hiring Services - Sedan; 2500 km x 320 hours; Local 24*7
Various Fly ash Spares
Thermal Paper (V3) Conformingto IS17568 (Q4)
High End Laptop - Notebook (Q2), Interactive Panels with CPU (Q2) (3 (3 ))
Ceralined PF Bends and orifice for Coal Mill
Hiring of Earth Moving Equipments, Material Handling Equipments and Cranes (per Hour basis) - As Per Buyer's Requirement; Material Handling Equipment, Earth Moving Equipment; Bull Dozer
Drinking Water Coolers (V4) ISI Marked To IS 1475 (Q2) ( PAC Only ) ( ( 3 3 ))
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - PW 113G Rate contract for carry out third party arc flash study for improving human safety at UTPS HT and LT System of Unit 3 to 5 at EMD 2; Power House Equipment, As p..
IP Control Valve Oil Filter ( 6 the number pi ), OIL FILTER-SIMOLAX- SEAL OIL SYSTEM ( 2 the number pi )
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - THERMAL POWER PLANT; Work of complete overhauling, oil leakage attending, high vacuum oil filtration and testing of 25 MVA, 220/7 KV, 3 nos of Power transformer at GTPS, ..
Asset Valuation Services - Valuation Report; Onsite
Plain Copier Paper (V3) ISIMarkedto IS14490 (Q4) (PACOnly)
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - PW-87 Work Contract of checking of Emerson make UPS system (2*40KVA, Model: 7400) of Unit no-4 of Ukai TPS; PW-87 Work Contract of checking of Emerson make UPS system (2..
Hiring of Agency for IT Projects- Milestone basis
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - THERMAL POWER PLANT; The work of Work of Repairing of Upper Lower Journal housing and Journal shafts of coal mills BCP 2360 77 of Unit No 3 and 4 of GTPS on as and when ..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - As per mentioned in the buyer added ATC; As per mentioned in the buyer added ATC; As per mentioned in the buyer added ATC
Electronic Weigh Bridge (Without Civil Work) (Q3)
Pressure Gauge-BHEL (Q3)
Plain Copier Paper (V3) ISI Marked to IS 14490 (Q4)
Manpower Outsourcing Services - Minimum wage - Unskilled; Secondary School; Others
Supply of spares for Governing system and its auxiliaries for
Fall Protection-Horizontal Life Line Includingend Anchors asper EN795: 2012 Type C (PNG) (Q2)
Custom Bid for Services - Mitigation works for AC/DC interference of High Tension Power Transmission lines with GITL Pipeline Cathodic Protection system Similar Category Repair, Maintenance and Installation of Plant Systems/Equipments
Commercial UPVC Fittings (Q3)
Operation And Maintenance Of Water Supply Systems - Work of maintenance of fire water piping and colony water supply piping at GTPS on as and when required basis
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - AS PER ATC; PW-84 Work of servicing calibration of Pulsecho make radiation survey meter of 500 MW unit6 Ukai TPS; AS PER ATC
Operation and Maintenance Power House/Power Plant - As per ATC
Crematoria bed (Q3) (3 (3 ))
Supply of Stationary Item for GSECL CO Vadodara
Supply of Electrical Hand Gloves for Power station of GSECL
Plain Copier Paper (V3) ISIMarkedto IS14490 (Q4)
Handling and Transport on Lumpsum Basis - Handling & Transport Service, Work of Loading Unloading AND Transportation of H2 AND CL2 gas Cylinders Tonners Filled Empty from GACL Vadodara to GTPS AND vice versa on as and when required basis for 24 ..
Television (V3) (Q2)
Circular Sheathedwith Flexible Conductor (V2) ISIMarked To IS694 (Q2)
Insulatedpliers (Q3) (PACOnly)
SHAFT SLEEVE (DS) , PART NO. - 3100101 ( 4 Unit ), INT. SHAFT SLEEVE, PART NO. - 3120101 ( 16 Unit ), Delivery Days IMPELLER SHAFT SLEEVE FOR VTP BHQ-92 ( 2 Unit ), DISTANCE SLEEVE/SPACER SLEEVE, PART NO. - 3170101 ( 4 Unit ), IMPELLER SHAFT SLEEVE FOR VTP BHM-100 ( 3 Unit )
Operation and Maintenance Power House/Power Plant - As Per ATC