Loading…
Loading…
4,815 results • Latest
Monthly Basis Cab & Taxi Hiring Services - SUV; 2000 km x 320 hours; Local 24*7
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Office Space; Power House Equipment; Service Provider
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - 220 KV Sec 18 YEIDA; Substation; Service Provider
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - 400 kv substation; Substation; Service Provider
Custom Bid for Services - Thermal Insulation of HP LP valves and pipeline of Turbine and Auxiliaries of O/H#4 and O&M of Unit # 4&5, 2X500 MW BTPS, Anpara Similar Category Operation and Maintenance Power House/Power Plant
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Power House Equipment; Service Provider
Non-contact Radar Level Transmitter EIP compact wave Model-CW 58-P-H-GE-HE-2-B-D-N-A CW 5X series Ra
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Commercial; Electrical System or Installation; SEMI TURNKEY
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Substation, Switchyard, Power House Equipment, Electrical System or Installation; Service Provider
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - 132 KV Sub Station Aurangabad; Repair of fire bucket stands by fixing suitable size pices of fresh 22 gauge sheet to canopy and side by welding grinding etc; Service Pro..
Operation And Maintenance Of Switchyard - As per enquiry
Operation And Maintenance Of Switchyard - as per enquiry
Monthly Basis Cab & Taxi Hiring Services - SUV; 3000 Km x 364 hours; Local 24*7
Operation and Maintenance Of Electrical Systems/Electrical Installations - AS PER TERMS & CONDITIONS
Procurement of 14 Nos. 160MVA, 220/132kV Auto Transformer
MATERIALS FOR MAINTENANCE WORK AT 132KV SUB STATION GHATAMPUR UNDER ETD-II KANPUR
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Electricity Substation; Power House Equipment; Service Provider
Operation And Maintenance Of Switchyard - Complete System
Operation And Maintenance Of Switchyard - Complete System
Pump Shaft, Part No.11, MOC- SS-410-ASTM-A276, Impeller Key, Part No.13 MOC- SS-AISI-316, Line Shaft, Part No. 29, MOC- SS-410-ASTM-A276, Line Shaft Sleeve, Part No. 33, MOC- SS-316 ASTM-A276, Top Shaft Sleeve, Part No.48, MOC- SS-316 ASTM-A276, Water Seal Ring, Part No.54, MOC- Bronze IS 318, LTB-II, Water Slinger Assy., Part No.57, MOC- CI IS-210, FG-260, Top Shaft, Part No.64, MOC- SS-410-ASTM-A276
13.0 Meter Long Steel Tubular Pole 410-SP-72
Substation Clamps/Connectors (Q3)
Substation Clamps/Connectors (Q3)
Operation and Maintenance Power House/Power Plant - Repairing of Spares of RCF, MILL & FAN OF 3X200 MW BTPS OBRA
Monthly Basis Cab & Taxi Hiring Services - SUV; 2500 km x 320 hours; Local
Monthly Basis Cab & Taxi Hiring Services - SUV; 2500 km x 320 hours; Local
Supply of Various Electrical Equipments for Electricity
Dismantling of defective CB pole assembly, Checking and shifting of spare CB pole, Safe carriage of CGL make 132KV CB pole, Erection of spare CB pole with SF-6 filling, Dismantling and repair of CB valve assembly
Facility Management Services - LumpSum Based - As Per Enquiry; As Per Enquiry; Consumables to be provided by service provider (inclusive in contract cost)
Operation And Maintenance Of Substation - Overhauling of exhaust fan
Operation And Maintenance Of Substation - Complete overhauling and rewinding of cooling fan and motor
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Substation, Switchyard, Electrical System or Installation; Service Provider
Alumino-Ferric (V2) Conformingto IS299 (Q3)
33 KV GI Stay Set 20x1800 MM
Monthly Basis Cab & Taxi Hiring Services - Sedan; 1500 km x 320 hours; Local 24*7
Monthly Basis Cab & Taxi Hiring Services - Sedan; 1500 km x 320 hours; Local 24*7
Monthly Basis Cab & Taxi Hiring Services - Sedan; 2000 km x 320 hours; Local 24*7
Exercise Books Conformingto IS5195 (Q4)
Monthly Basis Cab & Taxi Hiring Services - Sedan; 2500 km x 320 hours; Local 24*7
Monthly Basis Cab & Taxi Hiring Services - Sedan; 3000 Km x 364 hours; Local 24*7
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - 220/132 KV SUBSTATION; Substation, Switchyard, Power House Equipment, Electrical System or Installation; Service Provider
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - For Repairing of 10/16 KVA to 400 KVA Damaged Distribution Transformer at Lalitpur Workshop under EWD, Jhansi; Damaged Distribution Transformer; As Per ATC Document and ..
PROCUREMENT OF SPARE PARTS OF BOILER
PROOFEX PVC Sheet Flexible PVC 1 mm 600 mm 1200 mm
PROOFEX PVC Sheet Flexible PVC 1 mm 600 mm 1200 mm
Operation And Maintenance Of Substation - Repairing of store -1
Operation And Maintenance Of Substation - Repairing of store -2
197BOQ PUTTY ITEMS ATPS ANPARA
Timedelayrelay (Q3)
CONTACTOR RELAY (Q3)