Loading…
Loading…
4,748 results • Latest
Unbranded Substation Clamps/ Connectors, Rated Current 800, Unbranded Substation Clamps/ Connectors, Rated Current 800 Ampere
Surdhi 3 Rotary Switch Front Mounting on panel with mouting, Surdhi 3 Rotary Switch Front Mounting on panel with mouting screws
Unbranded Electrical Cable Lugs for 95 Sq. mm. Conductor
Custom Bid for Services - Increasing capacity of 100 KVA to 250 KVA Distribution Transformers on Semi Turnkey basis in Business Plan 2026-27 under the area of Electricity Distribution Division, Saifai Similar Category Operation And Maintenance Of Substation Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) Repair, Maintenance and Installation of Plant Systems/Equipments
Unbranded Electrical Cable Lugs for 185 Sq. mm. Conductor
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Commercial; Electrical System or Installation; Buyer
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Commercial; Electrical System or Installation; Buyer
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Commercial; Electrical System or Installation; Buyer
File/Folder (V3) (Q4)
Shifting of 33 KV 11 KV and LT lines and other electrical
FAG
Input Pinion Shaft of Gear Box, Hold Back Assembly of Conveyor 9A and B Gear, Geared Coupling For Gear box, Input Pinion Shaft of Gear Box No HG 11224, Hold Back Assembly of Conveyor 9A and B Gear Box
Monthly Basis Cab & Taxi Hiring Services - SUV; 1500 km x 320 hours; Local 24*7
Custom Bid for Services - Installation of New 250 KVA Distribution Transformers in Business Plan 2026-27 on Semi Turn-key Basis under the area of Electricity Distribution Circle, Etawah Similar Category Operation And Maintenance Of Substation Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) Repair, Maintenance and Installation of Plant Systems/Equipments
Custom Bid for Services - Installation of New 16 KVA, 63 KVA and 100 KVA Distribution Transformers in Business Plan 2026-27 on Semi Turn-key Basis under the area of Electricity Distribution Circle, Etawah Similar Category Operation And Maintenance Of Substation Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) Repair, Maintenance and Installation of Plant Systems/Equipments
Custom Bid for Services - Increasing capacity of 100 KVA to 250 KVA Distribution Transformers on Semi Turnkey basis under EUDD Etawah Similar Category Operation And Maintenance Of Substation Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) Repair, Maintenance and Installation of Plant Systems/Equipments
Entry and Mid Level Desktop Computer (Q2), A4 and Legal Size Multifunction Printer (MFP) (Q2), Line Interactive UPS with AVR (V2) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
ERW Coal Pipe
MII Purchase Preference No Fluid Coupling, Model: SM-02/12A, Flexible Coupling For Fluid Coupling (Model: SM-02/12A) Consist Of: (Hub X 01 No. , Flange X 01 No. ,
ASTECH MARKETING PRIVATE LIMITED Flue Gas Inlet, Secondary Hot Air & ID Fan Suction/Discharge Damper Complete Gear Box Model GS-25, Primery Hot Air APH, Flue Gas Outlet ESP Inlet, &PA Discharge Damper Complete Gear Box Model GS-200
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - 132/33 kV S/S Kirawali, Agra; Substation; Service Provider
Motor Protection Circuit Breaker (MPCB) (Q3)
Vacuum Contactor Conforming To IS/IEC60470 (Q3)
BEVEL GEAR Specification: Input Pinion Shaft with matching Gear(Part No. - 99 Bevel Set) for Gear Box, Input Shaft with matching Gear(Part No. 100 and 302) for Gear Box SZN 360 having S. No. - 3004972722/52
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Carriage of 400 KV CT; Substation; Service Provider
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Inspection of Two stage Vacuum pump NASH make size TC 11E installed in 2X210 MW BTPS PTPP Parichha during Annual Overhauling of Unit 4 by OEM service engi..
Low Voltage MCCB with Thermal Magnetic/Electronic Trip Unit Conforming To IS/IEC 60947 (Part 2) (Q3)
Clamps for LT Line
Substation Clamps/Connectors (Q3)
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - TRANSMISSION S/S; Power House Equipment; Service Provider
Replacement of conductor poles and associated work in
Replacement of conductor poles and associated work in
Replacement of Jarjar conductor poles and associated work
Register (V2) (Q4)
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - 132KV SS Kirawali Agra; Checking of Broken Earthing in Switch yard of 132KV SS Kirawali Agra; Service Provider
Operation And Maintenance Of Switchyard - Work as per Enquiry
Spares of DFA Evacuation System
Monthly Basis Cab & Taxi Hiring Services - SUV; 1500 km x 320 hours; Local 24*7
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - 132KV GIS SS Fatehpur Sikri Agra; Shifting and Proper stacking of material at 132KV GIS SS Fatehpur Sikri Agra; Service Provider
ECO RISE 2.34 kilogram Ream of 500 Sheet 75 gsm A4 size Plain, ECO RISE 2.34 kilogram Ream of 500 Sheet 75 gsm A4 size Plain Copier Paper
Primary Water Filter Cartridge, Filter Type: 1.53. 1.270. 750 DN 100, Equivalent to Fabr. No. : 3950138
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Commercial; Electrical System or Installation; Buyer
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Repairing and Overhauling of ACDB panel at substation manth mathura works includes the opeing and replacement of damaged terminals by new one proper dressing of ACDB tap..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Providing and fixing of LED ligths 150 watt street light involves the installation of a street light fixture with power rating of 150 watts at 400 KV Substation aurangab..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Office Space; Substation; Service Provider
LEAKAGE ARRESTING MATERIALS FOR POWER
Monthly Basis Cab & Taxi Hiring Services - Sedan; 2000 km x 320 hours; Local 24*7
LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II) (Q2), LED Batten Light (LED Tube Light) (V2) (Q2) (3 (3 ))
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Substation; Service Provider
Facility Management Services - LumpSum Based - M and R of PLASTER REPAIRING INTERNAL PAINTING AND OTHER MISC CIVIL WORKS IN RESIDENCE NO1/07 I/11 AT SHAKTIPURAM HYDEL STAFF and Residence NO 4/37 at VNP HYDEL OFFICERS COLONY LUCKNOW; M and R of PLA..