As per Tender document
As per tender document
Executive Engineer, Feeder Canal Division, Farakka
Interim measures for anti erosion work on the right bank of river ganga downstream of Farakka barrage between Ch 6300 m Ch 6600 300 mtrs (Reach 04) near Nayansukh Brhamngram under Feeder Canal Division, Farakka Barrage Project
Interim measures for anti-erosion work on the right bank of river ganga downstream of Farakka barrage between Ch 6000 m Ch 6300 300 mtrs (Reach 03) near Nayansukh under Feeder Canal Division, Farakka Barrage Project
Interim measures for anti erosion work on the right bank of river ganga downstream of Farakka barrage between Ch 5700 m Ch 6000 300 mtrs (Reach 02) near Nayansukh under Feeder Canal Division, Farakka Barrage Project.
Interim measures for antierosion work on the right bank of river ganga downstream of Farakka barrage between Ch 5400 m Ch 5700 300 mtrs. (Reach 01) near Nayansukh under Feeder Canal Division, Farakka Barrage Project.
Bank protection measures in between RD 38.80 and RD 39.10 on the left bank of the Feeder Canal under Farakka Barrage Project (Reach -6).
As per bid document
Interim measures for anti erosion work on the right bank of river ganga downstream of Farakka barrage between Ch 6600 m to Ch 6800 (200 mtrs) (Reach 05) near Brhamngram under Feeder Canal Division, Farakka Barrage Project
Interim measures for anti erosion work on the right bank of river ganga downstream of Farakka barrage between Ch 6300 m to Ch 6600 (300 mtrs) (Reach 04) near Nayansukh Brhamngram under Feeder Canal Division, Farakka Barrage Project
Interim measures for anti erosion work on the right bank of river ganga downstream of Farakka barrage between Ch 5700 m - Ch 6000 (300 mtrs) (Reach 02) near Nayansukh under Feeder Canal Division, Farakka Barrage Project
Interim measures for anti erosion work on the right bank of river ganga downstream of Farakka barrage between Ch 5400 m to Ch 5700 (300 mtrs.) (Reach 01) near Nayansukh under Feeder Canal Division, Farakka Barrage Project
Interim measures for anti erosion work on the right bank of river ganga downstream of Farakka barrage between Ch 6000 m to Ch 6300 (300 mtrs) (Reach 03) near Nayansukh under Feeder Canal Division, Farakka Barrage Project
As per bid document
As per Tender document
As per tender document
As per tender document
As per Tender Document
As per tender document
As per Tender Document
Restoration and strengthening works of Eroded 10th Marginal embankment at upstream left bank of river Ganga near Biharitola, Birnagar area between Ch. 140.00 m and Ch. 290.00 (total working curve length 265m) for the year 2026. (Reach-02)
Restoration and strengthening works of Eroded 10th Marginal embankment at upstream left bank of river Ganga near Biharitola, Birnagar area between Ch. 290.00 m and Ch. 335.00 (total working curve length 140 m) for the year 2026 (Reach-03)
Restoration and strengthening works of Eroded 10th Marginal embankment at upstream left bank of river Ganga near Biharitola, Birnagar area between Ch. 335.00 m and Ch. 380.00 (total working curve length 135 m) for the year 2026 (Reach-04)
Restoration and strengthening works of Eroded 10th Marginal embankment at upstream left bank of river Ganga near Biharitola, Birnagar area between Ch. 380.00 m and Ch. 540.00 (total working curve length 180m) for the year 2026. (Reach-05).
Repairing of potholes and approach to P.S.C. road-bridge of Farakka Barrage
As per tender document