Loading…
Loading…
2,124 results • Latest
TIRUPATI FENCE 7 Kg for 1830 mm long Post Fence Metal Angle, TIRUPATI FENCE 7 Kg for 1830 mm long Post Fence Metal Angle
TIRUPATI FENCE 7 Kg for 1830 mm long Post Fence Metal Angle, TIRUPATI FENCE 7 Kg for 1830 mm long Post Fence Metal Angle
TIRUPATI FENCE 7 Kg for 1830 mm long Post Fence Metal Angle, TIRUPATI FENCE 7 Kg for 1830 mm long Post Fence Metal Angle
BUC plantation in different locations of North Range under CAMPA 2026-27
BUC plantation in South Range of Ramnagar Forest Division under CAMPA 2026-27
Erection and commissioning of hanging solar power fencing around Vanchivayal Unnathi in Vallakkadavu Range during 2026-27
Vista line clearance from 183 A main road to Dam Site in Vallakkadavu Range during 2026-27
Fencing, Installation of Main Gate, Tile work alongwith other allied works in Inspection Hut Nowshera UNDER CAPEX 2026-27
The proposed project involves the construction of a Tree Top Hut Supported by GI Members fixing G.I. sheet roofing complete with all necessary fittings and accessories and carrying out finishing works at Thalakode Nagaravanam Project
Repair and renovation of B.O Hut Sujaligala UNDER CAPEX 2026-27
Tending operation and marking for IIIrd silviculture thinning in 2003 Teak Plantation Kadumana (8.15 ha) in Balavanthadukka of Bandadukka section in kasaragod range during2026-27
Maintenance of Elephant Proof Trench around Pandyanthodu Camp Shed in Vallakkadavu Range during 2026-27
Ceiling work Pandyanthodu Camp Shed in Vallakkadavu Range during 2026-27
Repair and Renovation of Range Office Cum Residence of Range Forest Officer, Lamberi Forest Range under CAPEX 2026-27
Maintenance of various vayals under Thondiyar Section in Vallakkadavu Range during 2026-27
Vista line clearance from Vallakkadavu to Vanchivayal in Vallakkadavu Range during 2026-27
Tending operation and marking for IIIrd silviculture thinning in 2002 teak plantation in Balavanthadukka of Bandadukka section in kasaragod range during2026-27
Vista line clearance from Vallakkadavu to Gavi in Vallakkadavu Range during 2026-27
Vista line clearance from IC to Pandyanthodu in Vallakkadavu Range during 2026-27
Vista line clearance from Kozhikkanam Double Cutting to Aruviyoda in Vallakkadavu Range during 2026-27
Vista line clearance from Kallar to Randattinmukku in Vallakkadavu Range during 2026-27
Tending operation and marking for IIIrd silviculture thinning in 2003 teak plantation in Balavanthadukka (4.5Ha)of Bandadukka section in kasaragod range during2026-27
Tending operation and marking for IIIrd silviculture thinning in 2006 Teak Plantation Kadumana(11.8 Ha) in Bandadukka section of kasaragod range during2026-27
Establishment of closure/unit by using Fencing, Plantation, Patch Sowing, Grass Slips in Comptt. No. 13a/U, 9/U, 15/U-I, 15/U-II, 15/U-III of Block Guddar Sangial Range Udhampur under CAMPA CA FY 2026-27
Establishment of closure/unit by using Fencing, Crate, DRSM, Plantation, Patch Sowing, Grass Slips, in Comptt. No. 41/P-I, II, III, IV, 16/P, 64/P, 27/P Panjar, Damnote, Lander Block Range Panchari under CAMPA CA FY 2026-27
Establishment of closure/unit by using Fencing, Plantation, Patch Sowing, Grass Slips work in Comptt. No. 72/U, 73a/U-I, 73a/U-II, 73a/U-III, 73a/U-IV and NFL Khasra No. 1 Chirdi of Block Bali Tirshi Range Udhampur under CAMPA CA FY 2026-27
Establishment of closure/unit by using Fencing, Plantation in Comptt. No. 36/P Block Panchari Udhampur under CAMPA NPV FY 2026-27
Establishment of closure/unit by using Fencing, Plantation, Patch Sowing, Grass Slips work in Comptt. No. 50/U, 35/U-I, 35/U-II, Sansoo Rakh, Nehranal of Block Bhatti-Mali, Hartayan, Sansoo, Nehranal Range Udhampur under CAMPA CA FY 2026-27
Establishment of closure/unit by using Fencing, Plantation, Patch Sowing work in Comptt. No. 59a/D Dudu Block Range Dudu under CAMPA NPV FY 2026-27
Establishment of closure/unit by using Fencing, Crate, DRSM, Plantation, Patch Sowing, Grass Slips work in Comptt. No. 98/D, 97a/D, 97a/D, 98/D-I, 98/D-II Kud Block Range Dudu under CAMPA CA FY 2026-27
Maintenance and Raising of Nursery at Mand Pangara Nursery Udhampur Range under CAMPA FY 2026 27
Establishment of closure/unit by using Fencing, Crate, DRSM, Plantation, Patch Sowing, Grass Slips, DRSM work in Comptt. No. 74/D-I, 74/D-II, 74/D-III, 74/D-IV, 78/D, 74/D-V Gharrian Block Range Dudu under CAMPA CA FY 2026-27
BUC Plantation of 16108 nos. of Poly Bagged Plants in Pits in different locations of Panchari Forest Range under CAMPA FY 2026-27
BUC Plantation of 9977 nos. of Poly Bagged Plants in Pits in different locations of Dudu Forest Range under CAMPA FY 2026-27
Maintenance and Raising of Nursery at Thathli Nursery Panchari Range under CAMPA FY 2026 27
Raising and Maintenance of plants in Kassal Margana Nursery of Dudu Forest Range
Maintenance of 50000 Poly bagged plant Saplings at Balli Nursery Under CAMPA (NPV) 2026-27 of Rajouri Forest Division
TURNKEY CONTRACT FOR 30 SEATER FABRICATED BUS WITH BRANDING AND MODIFICATIONS AS PER GIVEN DETAILS, Speaker (V3), Wired Microphone (V2), Audio Digital Signal Processor
Construction of Control Room
Retender for the cost of Planting 3000 Seedlings at Shiriya as a part of integrated modern coastal fishing village under Pradhan Manthri Matsya Sampada Yoiana (PMMSY) through Social Forestry Range Kasaragod during 2025-26 and 2026-27.
Maintenance of trek path under Thondiyar Section in Vallakkadavu Range during 2026-27
Maintenance of trek path under Kozhikkanam Section in Vallakkadavu Range during 2026-27
Maintenance of trek path from Eettichuvadu to Kullar under Kalaradhichan Section in Vallakkadavu Range during 2026-27
Maintenance of trek path under Kalaradichan Section in Vallakkadavu Range during 2026-27
Maintenance of trek path under Aruviyoda Section in Vallakkadavu Range during 2026-27
Cost of providing beautification works in front of pavilion at Vettimurichakone in Neyyar
Cost of providing various beautification works at Kombai in Neyyar
ESTIMATE FOR THE COST OF ERECTION AND COMMISSIONING OF HANGING SOLAR POWER FENCE AT KARERI TO PUZHAMOOLA AREA PULPALLY FS