| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.1 LAccepted-Finance | ₹7.1 L | L1 | Accepted-Finance ok |
| 2 | L2₹7.1 L+₹5,040.46 (0.71%)Accepted-Finance | ₹7.1 L+₹5,040.46 (0.71%) | L2 | Accepted-Finance ok |
| 3 | L3₹7.8 L+₹71,766.58 (10.1%)Accepted-Finance | ₹7.8 L+₹71,766.58 (10.1%) | L3 | Accepted-Finance ok |
| 4 | L4₹8.0 L+₹89,168.18 (12.6%)Accepted-Finance | ₹8.0 L+₹89,168.18 (12.6%) | L4 | Accepted-Finance ok |
| 5 | L5₹8.3 L+₹1.2 L (16.7%)Accepted-Finance | ₹8.3 L+₹1.2 L (16.7%) | L5 | Accepted-Finance ok |
Tender Value
₹12 L
EMD Value
₹24,000
Closing Date
17 Aug 2026, 6:00 pmClosed
DFO Nowshera
O/o DFO Nowshera
Fencing, Installation of Main Gate, Tile work alongwith other allied works in Inspection Hut Nowshera UNDER CAPEX 2026-27
2026_FD_320013_1
e-nIT-20 of 2026-27
Open Tender
Civil Works
Percentage
45 days
Nowshera Range
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
DFO Nowshera
₹24,000
3 Sept 2026
7 Aug 2026
18 Aug 2026
7 Aug 2026
17 Aug 2026
7 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation work in excavation by manual means for foundations, drains, pipes, cables etc. (not exceeding 1.5m in width) and for shafts wells cesspits and the like not exceeding 10 sqm on plan, depth upto 1.5 M including the disposal of excavated earth upto 1 M from the cutting edge, disposed earth to be levelled and neatly dressed in all kinds of soil. | 1 | Cum | - | - |
| 2 | Surface dressing of the ground including removing vegetation and in-equalities
not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto
1.5 m in -All kinds of soil. | - | Sqm | - | - |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:5:10 (1 Cement : 5 coarse sand :10 graded stone aggregate 40 mm nominal size) | - | Cum | - | - |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level.1:3:6 (1 cement :3 coarse sand : 6 graded stone aggregate 20mm nominal size) | 1 | Cum | - | - |
| 5 | Reinforced cement concrete work in walls (any thickness) including attached pilasters,buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. | 1 | Cum | - | - |
| 6 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. | - | Qtl | - | - |
| 7 | Centring and shuttermg including strutting, propping etc. and removal of form for· Columns, pillars, piers, abutments, posts and struts | 1 | Sqm | 1 | ₹1 |
| 8 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting , hoisting , fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Hot finished welded type tubes To be paid as per acutal during execution (GATE) | - | Kg | 1 | - |
| 9 | Providing and fixing gang saw cut mirror polished (pre moulded and pre polished), machine cut for kitchen platform, vanity counters window sills facias and similar locations of required size of approved shade, colour and texture laid over 20 mm thick base cement mortar 1:4 (1 cement : 4 coarse sand) with joints treated with white cement, mixed with matching pigment, epoxy touch ups, including rubbing, curing moulding and polishing to edge to give high gloss finish etc. complete at all levels. Granite of any colour and shape (Area of slab upto 0.5 sqm) 18mm | - | Sqm | 1 | - |
| 10 | Extra for providing edge moulding to 18 mm thick marble stone counters, Vanities etc. over item no. 8.2 including machine polishing to edge to give high gloss finish etc. complete as per design approved by Engineer-in-Charge Granite Work | - | Rmt | 1 | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.65 MB
BOQ_1061999.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .