Loading…
Loading…
527 results • Latest
Construction of road from Nonial to Bhatta via Sakna Galla (Under NABARD RIDF-XXXI-2025-26)
Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. (All kinds of soil 70%, ordinary rock 20% & hard rock by blasting 10%)
Construction of road from Kandi to Kesari Hill by way of earth work in cutting/filling construction of 12 Nos 1.00 Mtr dia H.P Culvert,02 No RCC culvert. R/B Wall, Pacca Drain, providing and laying , GSB, WBM Gr-II , 150 mm thick in two layers (75mm
Earth work in excavation by mechanical means (Hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 mtr in width as well as 10 sqm on plan) in average fixed classification as, 80% All kind of soil,10% Soft Rock & 10% Hard rock (Required blasting ) including disposal of surplus, excavated earth as directed by engineer- in-charge at site for safe disposal of same without damaging private/public property and all required leads/lifts and carriage. (Complete job)
Construction of road from Hathal Gabaldi Thumba to Barnada Pul. (Under NABARD RIDF-XXXI-2025-26)
Design and Construction of sub structure and super structure of 20.0 Mtr span (centre to centre) motorable bridge having clear carriageway width of 4.25 Mtr comprising of all components of the bridge i.e. Deep Foundation / Foudation, Abutments, Abutment caps, deck slabs, return/wing walls, approach slab i.e. providing and fixing of appropriate bearings, steel railings, painting of bridge including trench excavation for bridge foundation, dewarting etc. The design of the bridge should be vetted from DIQC/ IIT/ NIT and approved by competent authority. Latest version to be followed in design and soil investigation, sub soil investigation & exploration with all tests and design calculation (complete job)
read boq
Earth work in trench excavation by manual means in exceeding 10 sqm on plan, in aks
read boq
Earth work in bulk excavation by manual means in exceeding 10 sqm on plan, in 70% AKS and 30% OR
read boq
Earth work in trench excavation by manual means in exceeding 10 sqm on plan, in aks