Loading…
Loading…
2,226 results • Latest
Construction of 12 boundary pillars at Nadog Forest, Mahore Forest Division under UT Capex 2026 27 as per the approved design to be executed at different identified locations in accordance with the Tashree Burjiat.
Construction of 121 boundary pillars at Thalah Forest, Mahore Forest Division under UT Capex 2026 27 as per the approved design to be executed at different identified locations in accordance with the Tashree Burjiat.
Construction of 50 boundary pillars at Sarthala Forest, Mahore Forest Division under UT Capex 2026 27 as per the approved design to be executed at different identified locations in accordance with the Tashree Burjiat.
Construction of 40 boundary pillars at Jumman Forest, Mahore Forest Division under UT Capex 2026 27 as per the approved design to be executed at different identified locations in accordance with the Tashree Burjiat.
Construction of 94 boundary pillars at Matlote 1st Forest, Mahore Forest Division under UT Capex 2026 27 as per the approved design to be executed at different identified locations in accordance with the Tashree Burjiat.
MS BIG ENTERANCE GATE
Estimate for the cost of cleaning dead and wind fallen sandal trees and top ends collected from KSR-II Sandal Reserve at Sandal Depot Marayoor in Marayoor Range during the year 2025-26
Installation of BPs in Jandrore and Kansa Naal Forest Kurta Block of North Range
Installation of Boundary Pillars in Kanwa, Gundia Darbala and Kirmoo Forests of South Range
Installation of BPs in Kella, Katwalt and Maloi Bari Forest of Kurta Block
Installation of BPs in Khaal, Incha-II, Rajhal, Athnar, Dallan, Prey Forest of Kurta Block
Cost of formation and first year maintenance of 2026 Teak Plantation Ayiranalloor in Ayiranalloor Section of Anchal Range during 2026-27.
Construction of Boundary Pillars in Basantgarh Block of Basantgarh range
Construction of Boundary pillars in Sia Mehri Block of Basantgarh range
BOQ
BOQ
Construction of Boundary pillars in Khaned Block of Basantgarh range
BOQ
Cost of creation of Fire breaks in Uppupara Section of Azhutha Range during 2025-26.
BOQ
Installation of BPs in Kaitha, Marogli, Berin, Sarola, Badhoni, Kalan and Mathli Forests
Cost of creation of Fire breaks in Choozhy Section of Azhutha Range during 2025-26.
Installation of BPs in Kuh Ritti, Bid, Kuh, Dhandal di Keri and Pinger Forests of Thellay Block
Maintenance of Trek Path in Moozhickal Section of Azhutha Range during 2025-26
Installation of BPs in Seogali Gurnal and Joffer Forests in Kaitha Block of North Range
Maintenance of Trek Path in Sathram Section of Azhutha Range during 2025-26
Installation of BPs in Chattrari Forest Kaitha Block of Basantgarh Range
REFER TENDER NOTICE
Vista Clearance Work to a width of 10 m on either side at Ethinamudi-Nallathanni under Naiketty Forest Station of Sulthan Bathery Range in Wayanad Wildlife Division during 2025-26
Vista Clearance Work 5 m wide along both side of Kallur Junction- Chekuthanpara under Ottippara Section of Sulthan Bathery Range in Wayanad Wildlife Division during 2025-26
Construction of Septic Tank in Lion Enclosure at Jambu Zoo
Installation of 92 Nos of BPs in Pershulla Forest of Kuntwara Range under UT Capex for the year 2026-27
Vista Clearance Work 5 m wide along both side of Kallumukku- Kallur Junction under Ottippara Section of Sulthan Bathery Range in Wayanad Wildlife Division during 2025-26
Maintenance of Trek Path in Uppupara Section of Azhutha Range during 2025-26
Maintenance of Trek Path in Moozhickal Section of Azhutha Range during 2025-26
Maintenance of Trek Path in Sathram Section of Azhutha Range during 2025-26
Maintenance of Trek Path in Choozhy Section of Azhutha Range during 2025-26
Digging of 21500 Nos Pits having Size 1.5ft x 1.5ft x 1.5ft of 4 to 5 ft spacing including mechanical and manual work. Placing and Planting Plants in the Pits along with all fitting and packing material including carriage of plants and filling mate
Estimate for the cost of completion work of Canteen building at Rosemala in Ettappadappu section of Shendurney Wildlife Sanctuary during 2025-26
Estimate for the cost of renovation of View Tower Ticket Counter at Rosemala under Shendurney Eco Tourism in Shendurney Wildlife Sanctuary during 2025-26
The proposed project involves the installation of hanging solar fencing along a 3.5km stretch from Inchathotty Thookupalam to Neriamangalam Farm under the Jurisdiction of Kothamangalam Range to prevent man-animal conflict.
Estimate for the cost of replacement of roofing sheet of Forest Information Centre cum Ecotourism Information Centre at Thenmala in Shendurney Wildlife Sanctuary during 2025-26
Maintenance of treckpath at various places in Thekkady Range during 2025-26
Vista line clearance works from Methakanam to Mullakkudy in Thekkady Range during 2025-26
Desiliting waterholes at various places under NABARD TRANCHE XXX in Thekkady Range during 2025-26
Cost of vistaline clearance works at Anchuruli road on both side in Thekkady Range during 2025-26
Construction of vehicle shed at Periyar Range office in Periyar Range during 2026-27
Cost of Fire Protection Works under Tholpetty Forest Station of Tholpetty Range in Wayanad Wildlife Division during 2025-26.
Cost of Fire Protection Works under Dasankatta Section of Tholpetty Range in Wayanad Wildlife Division during 2025-26.
Cost of Fire Protection Works under Bavali Section of Tholpetty Range in Wayanad Wildlife Division during 2025-26.