Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 LAccepted-AOC MUKALEL AMARAVATHY P O KUMILY | KUMILY | IDUKKI | KERALA | ₹3.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹3.0 L+₹7,209.88 (2.42%)Rejected-Finance KAROTTUKOCHUPARAMBIL H MOONGALAR PO IDUKKI | IDUKKI | IDUKKI | KERALA | ₹3.0 L+₹7,209.88 (2.42%) | L2 | Rejected-Finance L2 |
| 3 | L3₹3.1 L+₹9,546.42 (3.21%)Rejected-Finance | ₹3.1 L+₹9,546.42 (3.21%) | L3 | Rejected-Finance L3 |
| 4 | L4₹3.2 L+₹25,902.18 (8.71%)Rejected-Finance | ₹3.2 L+₹25,902.18 (8.71%) | L4 | Rejected-Finance L4 |
| 5 | L5₹3.7 L+₹69,628.80 (23.4%)Rejected-Finance | ₹3.7 L+₹69,628.80 (23.4%) | L5 | Rejected-Finance L5 |
Tender Value
₹3.9 L
EMD Value
₹9,900
Closing Date
8 May 2026, 5:00 pmClosed
Deputy Director
Deputy Director, Periyar East Division, Thekkady
Construction of vehicle shed at Periyar Range office in Periyar Range during 2026-27
2026_FD_848643_1
R-25349/2026/S
Open Tender
Civil Works - Others
Percentage
30 days
Periyar Range
Please refer Tender documents.
5 documents required · 5 mandatory
₹950
Yes
₹9,900
Yes
10 Jun 2026
30 Apr 2026
11 May 2026
30 Apr 2026
8 May 2026
30 Apr 2026
30 Apr 2026 - 8 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Hot finished welded type tubes | 694.73 | kg | 194.27 | ₹1,34,965.2 |
| 2 | Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch of corrugation as approved by Engineer-in-charge) 0.50 mm (+0.05%), total coated thickness with zinc inc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top cost 15-18 microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches during transportation and should be supplied in single length upto 12 metre or as desired by Engineer-in-charge. The sheet shall be fixed using self drilling/self tapping screws of size (5.5x55mm) with EPDM seal, complete upto any pitch in horizontal/ vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. | 120.66 | sqm | 842.14 | ₹1,01,612.61 |
| 3 | Providing and fixing precoated galvanised steel sheet roofing accessories 0.50 ınm (+0.05%) total coated thickness, Zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns using self drilling/self tapping screwscomplete Ridges plain (500-600 mm) | 6.4 | mtre | 565.05 | ₹3,616.32 |
| 4 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. All kinds of soil | 16.08 | cum | 257.63 | ₹4,142.69 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering All work up to plinth level:1:2:4 (cement: 2 coarse sand (zone-III)derived from natural sources: 4 graded stone aggregate 20 min nominal size derived from natural sources) | 1.08 | cum | 9,235.97 | ₹9,974.85 |
| 6 | 52 mm thick cement concrete flooring with concrete hardener topping, under layer 40 mm thick cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and top layer 12 mm thick cement hardener consisting of mix 1:2 (1 cement hardener mix: 2 graded stone aggregate 6mm nominal size) by volume, hardening compound mixed @ 2 litre per 50 kg of cement or as per manufacturer's specifications. This includes cost of cement slurry, but excluding the cost of nosing of steps etc. complete | 74.05 | sqm | 1,073.32 | ₹79,479.35 |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1434833.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.04 MB
Tendernotice_2.pdf
PDF • 0.21 MB
Tendernotice_3.pdf
PDF • 0.07 MB
Tendernotice_4.pdf
PDF • 1.88 MB
BOQ_1434833.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .