Loading…
Loading…
2,126 results • Latest
Estimate for the cost of maintenance in Melano, Marten, Cyathea, Kurinji amenity centre at pampadum Shola National Park in Shola National Parks during 2026-2027
Estimate for the cost of construction of toilet block for Mulangamutty Anganwadi in Chinnar wildlife sanctuary during 2026-2027
RETENDER- Cost of Construction of Wheel Track from Earthdam to Poopara in Karimala Section under Parambikulam During 2025-26
Maintenance of Vallakkadavu Check post in Vallakkadavu Range during 2026-27
RETAINING WALL-ESTIMATE FOR THE COST OF RETAINING WALL AROUND CAMPSHED AT MEDAMCHAAL UNDER KARIMALA RANGE DURING - 2026-27-General Civil Work
20000 nos casuarina and mangrove associated seedlings nursery at Chalbeach under Thalassery Range
Raising 5000 nos mangrove plantation at Chirakkuni under Thalassery Range during 2025-26
As per tender Nit and boq
As per Nit and BoQ
As per Nit and BoQ
As per tender Nit and boq
BUC Planting of Conifer, Broad Leaved and Patch Sowing in various compartments of different blocks of Doodganga, Raithan and Sukhnagh Forest Ranges of Pir Panjal Forest Division Budgam under the scheme of CAMPA-NPV for the Financial year 2026-27.
As per Nit and BoQ
As per Nit and BoQ
BUC Planting of Conifer and Broad Leaved in various compartments of different blocks of Doodganga, Raithan and Sukhnagh Forest Ranges of Pir Panjal Forest Division Budgam under the scheme of CAMPA-CA for the Financial year 2026-27.
Upgradation of Range Office, S-Park Range Srinagar
see enit
see enit
see enit
see enit
Estimate for the cost of maintenance at amenity centre restaurant in Pampadum Shola National Park in Shola National Park during 2026-2027
Estimate for the cost of check post building renovation in Pampadum Shola National Park in Shola National Park during 2026-2027
Estimate for the cost of construction of store room in Eco shop at 5th mile Eravikulam National Park during 2026-2027
Estimate for the cost of maintenance of section forest officer quarters (house no enp 3 17) in eravikulam national park in Rajamalai range during 2026-27
Estimate for the cost of maintenance of section forest officer quarters (house no enp 2 17) in Eravikulam National Park in Rajamalai range during 2026-27
Estimate for the cost of renovation of old forest station building at Karimutty in Chinnar wildlife sanctuary during 2026-27
Estimate for the cost of DR compound wall pointing work at Vannamthura P and C in Chinnar wildlife sanctuary during 2026-27
As per Nit and BoQ
As per Nit and BoQ
Installation of hanging Solarfencing (3.67 KM) at Padappanppara to 3rd Block during 2025-26
Installation of Solar Fencing (1.5 K.M) at Njayappilly Church to Arambankudyi in Thattekkad Bird Sanctuary during 2026-27
As per Nit and BoQ
As per Nit and BoQ
Construction of BOs Hut at Shangus, Anantnag Forest Division.
Development of basking site/roosting site of turtle by way of construction of Stone pitched platform and sand beds and provision of installation of wire mesh for protection purpose at Gharana Wetland.
Installation of Gate for CF South Complex along with Approach Path to CF Cum DFO Residence Lidder Forest Division Bijbehara.
Improvement Upgradation of Nagarvatika at Momandaji Arwani. Lidder Forest Division Bijbehara
Repair and Renovation Fencing with square PCC Fence posts (32500 rft) in various Co,s of Jasrota Forest Range of Kathua Forest Division for the year 2026-27 under CAMPA CA
2nd year maintenance of 2025 Teak Plantation Adukuzhy in Thannithodu Forest Station of Vadasserikkara Range during 2026-27
Repair and Renovation Fencing with square PCC Fence posts (19700 rft) in various Co,s of Kathua Forest Range of Kathua Forest Division for the year 2026-27 under CAMPA CA.
Improvements to Salim Ali Nature Study Hall at Suvarnodyanam Biological Park under Nature Study Centre, Kalady during 2026-27
IMPROVEMENT OF ECO TOURISM BUS PARKING AREA UNDER MUTHANGA FOREST STATION IN MUTHANGA RANGE
Repair and Renovation Fencing with square PCC Fence posts (8000 rft) in various Co,s (20/K Kenta 6000 rft and 22/K Berighat 2000 rft) of Kathua Forest Range , Kathua Forest Division for the Year 2026-27 Under CAMPA NPV.
Painting and maintenance of staff quarters at Abhayaranyam Kaprikkad in Research Range Kodanad under NSC Kalady during 2026-27
Providing and Fixing of Angle Iron Fence Posts with Black Annealed Barbed Wire Fencing 6 strands at Strip Mohripora of Social Forestry Range Kokernag
FOR THE COST OF ERECTING NEW TEMPORARY KRAAL USING EUCALYPTUS LOGS AT MUTHANGA IN ELEPHANT SQUAD RANGE DURING 2025-26
Survey Demarcation and Boundary Protection (Construction and installation of missing, fully damaged Boundary Pillars in Najwon Surfraw Forest, Shutkari Fraw Forest and Sumbal Forest) of Sindh Forest Division Ganderbal Under CAPEX for the Year 2026
Establishment of closure in Co. No. 25/N-I North Range under CAMPA (NPV) 2026-27
Creation of New Fire lines and Maintenance of Fire Lines in Forest Range Tral during 2026 27 under CAMPA NPV Scheme.
Establishment of closure in Co. No. 26C/N North Range under CAMPA (NPV) 2026-27