REQUEST FOR PROPOSAL FOR The Design Development of Viksit Bharat Theme Park and 15 years Operation AND Maintenance (O AND M) at Pocket-D Madhuban Bapudham Scheme Ghaziabad
The bidder shall quote the total financial contribution towards the project capital cost as per Annexure-6. This should be either equal to or more than the minimum 25% contribution (Rs. 9,45,85,285). The quoted amount shall be considered as the total bidder contribution for financial evaluation.
REQUEST FOR PROPOSAL APPOINTMENT OF CONSULTANT FOR PROVIDING CONSULTANCY SERVICES FOR DEVELOPMENT OF CITY FOREST AT GHAZIABAD
Part A: Feasibility Studies & Preparation of Vision Master Plan as per scope of work defined in clause no. 3.1 (Fee per acre) without GST
CONSTRUCTION OF OPEN AIR THEATRE IN SHAHEED SMARK PARK AT INDUSTRIAL POCKET , MADHUBAN BAPUDHAM SCHEME
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50m and lift up to 1.5m, disposed earth to be levelled and neatly dressed. (DSR Item No.2.6.1)
Annual Maintenance work of Sewer line, Water Line, Sweeping and disposal of garbage at Koyal Enclave Scheme (For One year)
Supply of Sweeper (Full time) SI no 24(a)/p-8/2022+5%
Coveringdrains and cableducts on road from HapurRoad to Thana MBDNDRF Road, P/F curvestones and paintingretroreflective signageboards P/FofLEDropelights street lightpoles of road annual maint.andsupplytrayswithplantsovercabletrench and maint. for 2y
Part -A Dismantling of cement concrete or granolithic floors including base concrete including stacking of dismentaled materials as directed by E/l within a distance of 60 m. As per SOR 2022 S.1. no. 697
STRENGTHENING OF ROADS, CONSTRUCTION OF FOOTPATH, INSTALLATION OF SIGNAGE BOARD, REPAIRING OF DIVIDER AND DRAIN IN KOYAL ENCLAVE SCHEME.
Cleaning jungle including up rooting of rank, vegetations grass, push, wood trees and samplings of grith upto 30 cms.measuredat aheight of 1M. above ground level and remova lof rubbish upto a distance of 50M. out side the periphery of area cleared. DSR 2.31/2023