Loading…
Loading…
8 results • Latest
Hotmixing of Roads at Canacona Industrial Estate
Earthwork in excavation by mechanical means (hydraulic excavator)/manual means in foundation pipeline trenches drain (not exceeding 1.5 m in width or 10 sq.m. on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m.All kinds of soil
Construction of new office building at Sanguem Industrial Estate.
Clearing jungle including up rooting of rank vegetation grass bush wood trees and sapling of girth upto 30 cm. measured at a height of 1 m above ground level & removal of rubbish upto a distance of 50 mt. outside the periphery of the area cleared. (if however, only grass is met with the area will be measured and paid for under item 4001).
Upgradation of pick up stand at Verna Industrial Estate.
Earthwork in excavation by mechanical means (hydraulic excavator)/manual means in foundation pipeline trenches drain (not exceeding 1.5 m in width or 10 sq.m. on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m. Hard rock where blasting prohibited
Construction of road along with drainage and retaining wall adjacent to plot No OP-5A in Phase II at Verna Industrial Estate
Construction of embankement with approved material obtained from borrowpits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting with vibratory roller to meet requirement of Table 300-2 as per MORTH specification 305
Hotmixing of Roads of Phase-I, II and part of Phase-III at Kakoda Industrial Estate.
Earthwork in excavation by mechanical means (hydraulic excavator)/manual means in foundation pipeline trenches drain (not exceeding 1.5 m in width or 10 sq.m. on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m.All kinds of soil
Construction of Roadside drainage from Prism RMC to TCPL, along HPCL compound wall and Cross drain near Prism RMC for GIDC main road at Kundaim Industrial Estate
Earthwork in excavation by mechanical means (hydraulic excavator)/manual means in foundation pipeline trenches drain (not exceeding 1.5 m in width or 10 sq.m. on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m. All types of Ordinary rock including all types of laterite rock, blasting prohibited