Loading…
Loading…
17 results • Latest
Please refer Tender documents
Construction of embankement with material obtained from borrow pits (Lead upto 10km) (Analysis as per MORTH specification 305)
Please refer Tender documents
Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.5m. & lead upto 30m. Including filling , watering & ramming of excavated earth into the trenches or into the space between the building & the sides of foundation trenches or in to the plinth removal & disposal of surplus earth as directed by the engineer in charge upto a distance of 30m from the foundation trenches. (Excluding Royalty) (S.I.No-251)
Please refer Tender documents
Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.5m. & lead upto 30m. Including filling , watering & ramming of excavated earth into the trenches or into the space between the building & the sides of foundation trenches or in to the plinth removal & disposal of surplus earth as directed by the engineer in charge upto a distance of 30m from the foundation trenches. (Excluding Royalty) (S.I.No-251)
Please refer Tender documents
Construction of embankement with material obtained from borrow pits (Lead upto 10km) (Analysis as per MORTH specification 305)
Please refer Tender documents
Construction of embankement with material obtained from borrow pits (Lead upto 10km) (Analysis as per MORTH specification 305)
Please refer Tender documents
Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.5m. & lead upto 30m. Including filling , watering & ramming of excavated earth into the trenches or into the space between the building & the sides of foundation trenches or in to the plinth removal & disposal of surplus earth as directed by the engineer in charge upto a distance of 30m from the foundation trenches. (Excluding Royalty) (S.I.No-251)