Loading…
Loading…
127 results • Recent activity
Stationary Valve Regulated Lead Acid Batteries (V3) Conforming To IS15549 (Q3)
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - WT 5159G Work of full length replacement of apron feeder chain with pan and its related auxiliaries for 500 MW coal handling plant at Ukai TPS CHP-3; As per Schedule B a..
Operation and Maintenance Of Electrical Systems/Electrical Installations - Work of Maintenance and replacement of lighting fixtures street light points etc at TPS Gandhinagar
Pointer Fixer for Pressure Gauges, Pointer puller for Pressure Gauges, Dial type indicating Pressure Gauges
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - WT 5105G Work of Various Routine Preventive and Breakdown maintenance of Feeder Breakers of CHP I at TPS UKAI on as and when required basis (CHP 1); Various Routine Prev..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - WT 5108G Fabrication Dismantling Erection modification of various chutes of coal handling plant of UKAI TPS on as and when required basis (CHP-1 and 2); Fabrication Dism..