Loading…
Loading…
175 results • Latest
Cation Exchange Resin-IS:7330 (Q3), Anion Exchange Resin-IS:7330 (Q3) (3 (3 ))
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - WT-5143G - Work of overhauling/in-situ repairing of HP-LP bypass valves, its associated spray valves and Hydraulic Actuators installed in HP-LP bypass system during R&M ..
Various Fly ash Spares
Ceralined PF Bends and orifice for Coal Mill
Hiring of Earth Moving Equipments, Material Handling Equipments and Cranes (per Hour basis) - As Per Buyer's Requirement; Material Handling Equipment, Earth Moving Equipment; Bull Dozer
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - THERMAL POWER PLANT; Work of complete overhauling, oil leakage attending, high vacuum oil filtration and testing of 25 MVA, 220/7 KV, 3 nos of Power transformer at GTPS, ..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - THERMAL POWER PLANT; The work of Work of Repairing of Upper Lower Journal housing and Journal shafts of coal mills BCP 2360 77 of Unit No 3 and 4 of GTPS on as and when ..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - As per mentioned in the buyer added ATC; As per mentioned in the buyer added ATC; As per mentioned in the buyer added ATC
Supply of spares for Governing system and its auxiliaries for
Operation And Maintenance Of Water Supply Systems - Work of maintenance of fire water piping and colony water supply piping at GTPS on as and when required basis
Supply of Stationary Item for GSECL CO Vadodara
Supply of Electrical Hand Gloves for Power station of GSECL
Operation and Maintenance Power House/Power Plant - As Per ATC
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - THERMAL POWER PLANT; Repairing and replacement of various transfer points of conveyor structure, old, rusted MS SS decking plates bottom plates platform grill on var..
Hiring of Third-Party Inspection Agency - Machinery & Equipment; Work of Testing examination inspection and certification of 1 Lift 2 Lifting machines and lifting tackles 3 Pressure vessels at GTPS for the year 2025 2026; Government Test Agency
Operation and Maintenance Of Electrical Systems/Electrical Installations - Distribution panel retrofitting work and JB fitting work in each block at GTPS
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - THERMAL POWER PLANT; Work of cleaning and checking of Rectifier Transformers Support Insulators and its Housing and shaft Insulators at ESP Top during ..
Monthly Basis Cab and Taxi Hiring Service - Without Fuel - SUV; Mahindra Bolero Neo 8; 2025; 0-25, 000 kms; A/C; 12, Monthly Basis Cab and Taxi Hiring Service - Without Fuel - Sedan; Maruti Suzuki Dzire; 2025; 0-25, 000 kms; A/C; 12
Collecting Electrode with locking plate, Collective Electrode with C Clamp
Customised Ambulance with Equipment (Q2) (3 (3 ))
Submersible Pumps for Slurry Application (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Calibration Services - Electrical; Voltage, Current, Power (AC/DC), Frequency, Power Factor, Phase Angle, Resistance, Temperature; NABL Labs; Hybrid (detailed in scope of work)
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - WT 5105G Work of Various Routine Preventive and Breakdown maintenance of Feeder Breakers of CHP I at TPS UKAI on as and when required basis (CHP 1); Various Routine Prev..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - WT-5137G - Work of Complete Overhauling (Mechanical & Electrical work) for 10 tones capacity EOT crane installed at CW Pump House for Units 3, 4 & 5 at Ukai TPS - TMD-II..
Electrical Rescue Rod (Q3), Respiratory Filter - Full Face Masks (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller OEM Authorization Certificate, Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled No Type of Bid Two Packet Bid Primary product category Electrical Rescue Rod Bid Number : GEM/2025/B/6263044 Dated : 14-06-2025 Bid Document 1/7 Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 183591 Evaluation Method Item wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank Bank Of Baroda (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 13 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : CHIEF ENGINEER Gandhinagar Thermal Power Station, Gujarat State Electricity Corporation Limited, Gandhinagar-382041, Gujarat (Chief Engineer) Splitting
Project Management Consultancy (PMC) Service - Supervision Consultancy (SC); Normal Highway Projects; Technical Audit and Quality Assurance as Authority Engineer for Construction of various Civil Infrastructures for 500 MW Harsad Solar Park Dist Bana..
Vehicle Hiring Service - Per Vehicle-Day basis - SUV/MUV; As Per ATC; Local; Plain; As Per ATC; Round Trip
Custom Bid for Services - Work of capacity enhancement at Coal Handling plant Stage-II of Ukai TPS on EPC basis Similar Category Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2)
Item1, Item2, Item3, Item4, Item5, Item6, Item7, Item8, Item9, Item10, Item11, Item12, Item13, Item14, Item15, Item16, Item17, Item18, Item19, Item20
ORIFICE SIZE 426 FOR PF PIPE DIA 558, ORIFICE SIZE 437 FOR PF PIPE DIA 558, ORIFICE SIZE 442 FOR PF PIPE DIA 558, ORIFICE SIZE 448 FOR PF PIPE DIA 558, ORIFICE SIZE 453 FOR PF PIPE DIA 558, ORIFICE SIZE 458 FOR PF PIPE DIA 558, ORIFICE SIZE 463 FOR PF PIPE DIA 558
Operation and Maintenance Power House/Power Plant - COAL PLANT
Repair and Overhauling Service - Camera for CCTV System (V2); PRAMA; Yes; Buyer Premises
Operation and Maintenance Power House/Power Plant - THERMAL POWER PLANT
Handling and Transport on Lumpsum Basis - WT 5133G Biennial rate contract for coal handling works for CHP I and CHP II at Ukai TPS CHPO, Handling Service
File/Folder (V3) (Q4), Register (V2) (Q4), Stapler Pin Staples (V2) (Q4), stamp pads (Q4)
Boot Multipurpose (Q3) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2025/B/7026189 Dated : 20-12-2025 Bid Document 1/10, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 3 Bid to RA enabled No Type of Bid Two Packet Bid Primary product category Boot Multipurpose Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Cotton Yarn Waste (V2) as per IS 5485 (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6822923 Dated : 29-10-2025 Bid Document 1/5 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 5 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 49950 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
36" Gravimetric Feeder Belt at GTPS
Technical Grade Sulfur Hexafluoride (SF 6) for use in Electrical Equipment as per IS 13072 (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6475931 Dated : 02-08-2025 Bid Document 1/5, -- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 343616 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank Bank Of Baroda (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 4 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : CHIEF ENGINEER Gandhinagar Thermal Power Station, Gujarat State Electricity Corporation Limited (GSECL), Gandhinagar, Gujarat-382041 (Chief Engineer) Splitting
Operation And Maintenance Of Water Supply Systems - AS PER ATC
Junction Box for Lighting (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2025/B/7000161 Dated : 10-01-2026 Bid Document 1/13, -- Number of days for which Bid would be auto -- extended 10 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Primary product category Junction Box for Lighting Time allowed for Technical Clarifications during technical evaluation 4 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Item wise evaluation Arbitration Clause Yes ( Arbitration clause document ) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 Arbitration should not be routinely included in contracts Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - THERMAL POWER PLANT; Removal/Replacement/Erection of Metallic Expansion bellows of APH; Service Provider
Software Support Services 2.0 - Microsoft; Application Software; Implementation Services, Maintenance Services, Proactive Monitoring Services; Software Enhancements, Real-time support, Technical Modifications, Helpdesk Assistance; General Service Pro..
Supply, Installation, Testing & Commissioning of IoT Devices IoT Data Logger/RTU for CEMS/EQMS D
Hiring Of Agency For ISO Certification Service - ISO 9001 - Quality Management System (QMS), ISO 14001 - Environmental Management System (EMS), ISO 45001 - Occupational Health & Safety Management System (OHAS); ISO Audit for WTPS (Schedule A) as per .., ISO 45001 - Occupational Health & Safety Management System (OHAS); ISO Audit for GTPS (Schedule B) as per .., ISO 45001 - Occupational Health & Safety Management System (OHAS); ISO Audit for UTPS (Schedule C) as per .., ISO 45001 - Occupational Health & Safety Management System (OHAS); ISO Audit for DTPS (Schedule D) as per .., ISO 45001 - Occupational Health & Safety Management System (OHAS); ISO Audit for STPS (Schedule E) as per .., ISO 45001 - Occupational Health & Safety Management System (OHAS); ISO Audit for UGBPS (Schedule F) as per.., ISO 45001 - Occupational Health & Safety Management System (OHAS); ISO Audit for KLTPS (Schedule G) as per.., Hiring Of Agency For ISO Certification Service - ISO 45001 - Occupational Health & Safety Management System (OHAS); ISO Audit for BLTPS (Schedule H) as per Schedule-B-II; As Per ATC, Hiring Of Agency For ISO Certification Service - ISO 45001 - Occupational Health & Safety Management System (OHAS); ISO Audit for KHEP (Schedule I) as per Schedule-B- II; As Per ATC, Hiring Of Agency For ISO Certification Service - ISO 45001 - Occupational Health & Safety Management System (OHAS); ISO Audit for UHEP (Schedule J) as per Schedule-B-II; As Per ATC, Hiring Of Agency For ISO Certification Service - ISO 9001 - Quality Management System (QMS); ISO Audit for CO (Schedule K) as per Schedule-B-III; As Per ATC
Stationary Valve Regulated Lead Acid Batteries (V3) Conforming To IS15549 (Q3)
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - WT 5159G Work of full length replacement of apron feeder chain with pan and its related auxiliaries for 500 MW coal handling plant at Ukai TPS CHP-3; As per Schedule B a..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - THERMAL POWER PLANT; Electrical rewiring work of old service building offices and various maintenance tool rooms in premises of GSECL GTPS plant lighting on as and when ..
Safety Footwear (V3) ISI marked to IS 15298 (Part 2) (Q2) ( ( 3 3 ))
Annual Maintenance Service - Desktops, Laptops and Peripherals - AS PER ATC; AS PER ATC