Loading…
Loading…
926 results • Latest
Construction of CC Drain from a.Infront of SBI Bank to D.No;3-4-103 b. D.No:2-1-14 to EP.No:151/11 in JV Stret Mukkadipeta-02 ward No:29 (1st Call)
Laying of C.C Drain and Culvert from D.No 20/MIG-27(Thimmappa House) to 20/LIG-89-a1, Culvert at D.No.20/LIG-98 at S.V Park Housing Board Colony 26th ward in Guntakal Municipality
Construction of CC Drain and Culvert from 25-2-70 to 25-2-72 at Lakeview Colony 1st Line in Division No.35 of Nellore Municipal Corporation
Providing arrangements for all festivals of Sri Venkateswara swamy and Sri Chandramouleswara Swamy Temples in Andhra Ashramam, Rishikesh, Uttarakand State for the year 2026-27
Construction BT Surface to the road from Ragikunta (V) to Donthikona at Ragikunta (V) of Dobbudupalle GP in Kondapuram Mandal of YSR Kadapa District, Est. Cost of Rs.120.00 Lakhs
Engaging of 1 No. Car (4+1 Seater) Diesel/Petrol /Hybrid /CNG/ Bio-Fuel /EV or any type (preference to be given to EV) on Monthly hired basis for the use of Superintending Engineer/Operation/Visakhapatnam in Operation Circle, APEPDCL, Visakhapatnam. The vehicle is under the control of the Superintending Engineer/Operation/Visakhapatnam with a model of 2021 and above for a Period of 12 months i.e., from 01.04.2026 to 31.03.2027
Laying of CC Road from D No.1/87 to D No.1/97 at Nagamma Colony in Division No.25 of Nellore Municipal Corporation
Improvements to the road Vinjamur-Kanigiri-Badvel (via) Chakalikonda, Timmareddi-Palli road from Km 12/0 to 17/0 in SPSR Nellore District
Puttur Municipality - 15th Finance Commission Grants - 2020-2021 (1st Installment) (Tide-Grant) - Supply and Delivery of 1100 Ltrs Capacity Compactor Bins (57 Nos.)
Improvement of Water Supply to Suncity Colony with 160mm Dia HDPE Pipe laying from Bharath Matha Colony 7th line to Suncity Colony 4th line 58th Division in Works Division-II Area
Laying of new600NB Raw Water MS Pipe Line header from fuel oil pump house to CW pump house of stage-III of approximately 715mtrs running length towards replacement of damaged pipe line of TM(CAM) Stage - IV for the year 2026-2027.
Construction of Block Public Health Unit(BPHU) at PHC B.N.Kandriga in Tirupati District.
Supply and Delivery of Coconut Brooms and HDPE Push Cart Bins (80 Ltr. capacity) to Sanitary Divisions in Ongole Municipal Corporation
Annual Maintenance of water fountains at different Locations in VMRDA parks / Office for the year 2026-27 (upto 31.03.2027)
Providing Compound Wall Painting, Leveling of Dust and Tent House Arragements on the occasion of Good Friday at Christian Burial Ground Anandapet in Div.No.10,11 (AE-13 Section)
Supply and Delivery of Coconut Brooms and HDPE Push Cart Bins (80 Ltr. capacity) to Sanitary Divisions in Ongole Municipal Corporation
Rectifecation of Leaks on 350 mm dia DI Pumping in HLR Tank -3 and Me-Seva Pumping Line and Replacement of Sluice Valve in HLR Premises of GMC.(4th call)
Annual Maintenance of water fountains at different Locations in VMRDA parks / Office for the year 2026-27 (upto 31.03.2027)
Construction of Balance portion Retaining wall to South side in Vishnu Park at Brundavan Gardens in Ward No.38 under AE-2 Section in Guntur Municipal Corporation.
CONSTRUCTION OF COMPOUND WALL BY THE SIDE OF STROM WATER DRAIN AT BRUNDAVAN APARTMENT IN DIV.NO.14 UNDER AE-11 SECTION
Construction of Balance portion Retaining wall to East side in Vishnu Park at Brundavan Gardens in Ward No.38 under AE-2 Section in Guntur Municipal Corporation.
Replacing damaged ugd,CC Drain and CC Road At mantri vari street 3rd line in Div.no.13 Under AE-11Section.(4th call)
Improvements to the existing TBCD ward at Paediatric Hospital premises, Tirupati
Providing Internal CC Road with Drains in Kasba Area at Banaganapalli
Providing Internal CC Road with Drains in Urban colony at Banaganapalli
Construction of RCC Stroam water Drain for Ambedkar Vagu from Vishal mart Culvert opposite to Prasanthi Nagar 4th line in Div No.46.
Providing CC Road and CC Drain at Chaitanya Nagar 6th and 7th lines and Rami Reddy Nagar Burial ground back side Road in Div.No.29 AE-18 Section.
Desiltation of Storm water drains, Major Drains & Medium Drains at Bhavaji peta, Valmiki Nagar, Kilchin peta, Dandugeri, Kummarigeri, Bhavaji peta-2, APHB Colony and Havannapeta in E.w.no.1,2,40,3,4,5 and 9, 10 in Adoni Municipality under BPS 2019 and LRS 2020 Funds
Supply and delivery of Alum in Adoni Municipality under General Funds 2025-26
Providing of 150mm dia Pipeline at Balanjaneya swamy gudi to Pole no.16/20/37 in Rayanagar in E.w.no.37 in Adoni municipality under General Funds 2025-26
Repairs & Renovation of Existing community toilets in opp. Head water works (Kottalu) at Ashok Nagar Ward No 43.
Providing earthing to Basapuram Head Water works in Adoni Municipality under General Funds 2025-26
REPAIRS AND IMPROVEMENT OF DOG FEEDING SHED AT ETUKURU ROAD COMPOST YARD IN GUNTUR MUNICIPAL CORPORATION
Providing CC Platforms to Cluster Compost Bins in Div No. 41 to 57 under Guntur Municipal Corporation
Restoration of major leak over 685mm dia CI pumping main at Selapadu under Guntur Municipal Corporation
Providing CC Platforms to Cluster Compost Bins in Div No. 1 to 20 under Guntur Municipal Corporation
Construction of CC Drains to Vengarala Rao nagar 2/3rd cross road in Div No.54 Under AE-14 Section.
Providing CC Drain to Maruthi Nagar 1st line in Div No.04 Under AE-12 (LB Nagar) Section(5th call)
Construction of CC Drains to Mothilal Nagar 0 line and Cross roads and Providing CC Roads to Mothilalal nagar 1st cross raod to 6th cross road in Div No.56 Under AE-6 Section. (3rd call)
Providing GSB Patch work at Mallikarjuna Peta Main Road in Div no:50 under AE-10 Section(4th call)
Dismantling of Old Damaged Slab over drain portion and Raising the existing drain walls at Regional Training Center in Div.No.04 Under AE-11 Section.(3rd Call)
Providing CC Road to Vengarala Rao nagar 2/3rd cross road in Div No.54 Under AE-14 Section.
Construction of CC Drains and providing cc road to Sanjeevaih nagar 4/1 in Div No.54 Under AE-14 Section.
Construction of CC Drains and providing cc road to Sanjeevaih nagar 4/2 in Div No.54 Under AE-14 Section.
Providing CC Drain to Vinobha Nagar 1 to 6 lanes in Div No.04 (6th call)
Providing and Widennign CC Road to Vasantharyapuram 1st line from bongarala beedu main road to 3rd Cross road in Div No.55 Under AE-14 Section.
Repairs to toilets, Providing necessary requirements, Supply & Delivery of Materials for maintenance of Community in ward 50-52, Kurnool Municipal corporation.
"Improvements to the road from km 0/0 to 7/0 of CT road to Chilamakur (Via) Thimmapuram, Penikalapadu in YSR Kadapa District (KDMD-077) (BY HMP)".
Construction and erection of GI shed for for parking two wheelers of staff at back side of Archaka Quarters of Sri Venkateswara Swamy Devasthanam, Vadapalli(V), Atreyapuram(M), Dr.B.R.Ambedkar Konaseema District
Construction of Ornamental works for Sri Mallikarjuna Swamyvari Pakasala in Main Temple complex