Loading…
Loading…
11 results • Latest
Request for Proposal for Appointment of Consultants for Preparation of Zonal Development Plans for Cluster 1 and 2 of Hapur Pilkhuwa Master Plan 2031
Request for proposal for consultancy services for preparation of Zonal Development Plans for Hapur-Pilkhua Development Authority
Work of Horticulture,beautification and maintenance for 01 year in the park constructed in Block E of Anand Vihar Housing Scheme
Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.
Maintenance of 08 developed parks in Transport Nagar Scheme and cutting of trees,plants planted in the schemes, cleaning of grass and bushes on road tracks and central verge
Complete maintenance of the entire garden features having as per yard stick in the garden area i.e. lawn trees, shrubs, herbs, edge, flower beds, foliages, creepers etc. including hoeing,weeding, pruning, replacement of plants, gap filling, watering, mowing of lawn, grass cutting by lawn mover and brush cutter, removal of garden waste, applying insecticide, pesticide & fertilizers(whenever required) top dressing of lawn with good earth and manure and maintenance of other garden related works as directed by office-in-charge (Cost of Good Earth, Manure, Fertilizer, Insecticide,Pesticide will be provided by the Department & lawn mover and brush cutter with fuel and other T & P material/articles shall be provided by the contractor.) For 24 months. 2.40.5 Play grounds/public parks (as per yard stick 1 mali=2.00 acre) (fector 2.40*0.972=2.33)
Work of strengthening the room on the first floor in the SP office
Dismantling roofing including ridges, hips, valleys and gutters etc., and stacking the material within 50 metres lead of: 15.28.1 G.S. Sheet
Construction work of CC road in village Rasulpur block Hapur
Dismantling manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge 15.43.2 bituminous road
Work of purchasing and installing 58.5 KVA DG set for camp office
Supply & Fixing of 58.5 KVA DG gen set with AMF panel AS per gem rate L1